共 50 条
- [1] Task scheduling for dynamic SMP clusters with communication on the fly for bounded number of resources [J]. ISPDC 2005: 4th International Symposium on Parallel and Distributed Computing, 2005, : 13 - 20
- [2] Comparison of Program Task Scheduling Algorithms for Dynamic SMP Clusters with Communication on the Fly [J]. PARALLEL PROCESSING AND APPLIED MATHEMATICS, PART II, 2010, 6068 : 31 - +
- [3] Task Scheduling for SoC-Based Dynamic SMP Clusters with Communication on the Fly [J]. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED COMPUTING, 2008, : 99 - 106
- [4] Program graph scheduling for dynamic SMP clusters with communication on the fly [J]. ISPDC 2004: THIRD INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED COMPUTING/HETEROPAR '04: THIRD INTERNATIONAL WORKSHOP ON ALGORITHMS, MODELS AND TOOLS FOR PARALLEL COMPUTING ON HETEROGENEOUS NETWORKS, PROCEEDINGS, 2004, : 149 - 154
- [5] Scheduling moldable tasks for dynamic SMP clusters in SoC technology [J]. PARALLEL PROCESSING AND APPLIED MATHEMATICS, 2006, 3911 : 879 - 887
- [6] Dynamic SMP clusters with communication on the fly [J]. SECOND INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED COMPUTING, PROCEEDINGS, 2003, : 250 - 257
- [7] Task graph structuring for dynamic SMP clusters with communication on-the-fly [J]. Concurrent Information Processing and Computing, 2005, 195 : 261 - 270
- [8] Atomic operations for task scheduling for systems based on communication on-the-fly between SMP clusters [J]. SECOND INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED COMPUTING, PROCEEDINGS, 2003, : 145 - 152
- [9] Parallel SSOR preconditioning implemented on dynamic SMP clusters with communication on the fly [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2010, 26 (03): : 491 - 497
- [10] Iterative reconstruction of tomographic scans in dynamic SMP clusters with communication on the fly [J]. PARALLEL PROCESSING AND APPLIED MATHEMATICS, 2006, 3911 : 304 - 311