共 50 条
- [2] Robotic technology for pipeline construction on earth & in space [J]. ENGINEERING, CONSTRUCTION AND OPERATIONS IN CHALLENGING ENVIRONMENTS: EARTH AND SPACE 2004, 2004, : 99 - 106
- [3] Issues in the use of clay in reinforced earth construction [J]. LANDMARKS IN EARTH REINFORCEMENT, VOL 1, 2001, : 495 - 500
- [4] Design and construction of reinforced earth walls on marginal lands [J]. GEOTECHNICS OF HIGH WATER CONTENT MATERIALS, 2000, 1374 : 337 - 350
- [5] Earth eco-building: textile-reinforced earth block construction [J]. CISBAT 2017 INTERNATIONAL CONFERENCE FUTURE BUILDINGS & DISTRICTS - ENERGY EFFICIENCY FROM NANO TO URBAN SCALE, 2017, 122 : 757 - 762
- [6] Reinforced Earth Structures. A New Construction Method. [J]. Bautechnik, Ausgabe A, 1976, 53 (07): : 217 - 226
- [7] Discussion on Construction Technology of Prestressed Reinforced Concrete Pipeline of Municipal Water Supply and Drainage [J]. 2017 3RD INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE (EEMS 2017), 2017, 94
- [8] Basal reinforced earth embankments on piled foundations: The role of embankment construction process [J]. GEOSYNTHETICS: LEADING THE WAY TO A RESILIENT PLANET, 12ICG 2023, 2024, : 2107 - 2112
- [9] Design and construction of reinforced earth retaining walls with height of 43m [J]. EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOL 6, 2000, : 4649 - 4652