Determination of A Deterministic Reliability Criterion for Composite Power System Expansion Planning

被引:0
|
作者
Cha, Junmin [1 ]
Park, Jeongje [2 ]
Choi, Jaeseok [2 ]
Jung, Youngbum [3 ]
Yun, Yongbum [3 ]
机构
[1] Daejin Univ, Dept Elect Engn, Pochon, GG, South Korea
[2] Gyeongsang Natl Univ, Dept Elect Engn, ERI, Jinju, GN, South Korea
[3] KEPCO, Seoul, South Korea
关键词
Composite power system expansion planning; Optimal reliability criteria; Power system reliability; Utility cost; Customer outage cost; TRANSMISSION EXPANSION;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The optimal design of composite power system expansion planning is proposed in this paper. One of main keys of the successful power system expansion planning comes from optimal reliability level/criteria decision, which should be given for a constraint in the optimal expansion problem. However, it's difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal power system expansion planning considering together generation and transmission systems. A deterministic reliability criteria, DMR(Delivery Marginal Rate) is used in this study. The optimal reliability criteria, DMR*, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using Korea power system.
引用
收藏
页码:1588 / +
页数:2
相关论文
共 50 条
  • [1] A study on probabilistic optimal reliability criterion determination in composite power system expansion planning
    Choi, J
    Thomas, R
    Wang, ZF
    El-Keib, AA
    Billinton, R
    2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 1277 - 1284
  • [2] Importance of Reliability Criterion in Power System Expansion Planning
    Slipac, Goran
    Zeljko, Mladen
    Sljivac, Damir
    ENERGIES, 2019, 12 (09)
  • [3] A method for composite power system expansion planning considering probabilistic reliability criteria
    Choi, J
    Tran, T
    El-Keib, A
    Thomas, R
    Oh, H
    Billinton, R
    2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 1270 - 1276
  • [4] Reliability-Constrained Robust Power System Expansion Planning
    Dehghan, Shahab
    Amjady, Nima
    Conejo, Antonio J.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) : 2383 - 2392
  • [5] Composite power system expansion planning considering outage cost
    Choi, Jaeseok
    Tran, Trungtinh
    Mount, T. D.
    Thomas, R.
    2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 2958 - +
  • [6] OPTIMUM EXPANSION PLANNING OF TRANSMISSION NETWORK FOR POWER-SYSTEM RELIABILITY
    MURAYAMA, Y
    ELECTRICAL ENGINEERING IN JAPAN, 1973, 92 (02) : 78 - 83
  • [7] Application of a Joint Deterministic-Probabilistic Criterion to Wind Integrated Bulk Power System Planning
    Billinton, Roy
    Gao, Yi
    Karki, Rajesh
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (03) : 1384 - 1392
  • [8] Application of Critical Clearing Time as a Transient Stability Criterion for Power System Expansion Planning
    Lenga, Oleg
    2014 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT ENERGY AND POWER SYSTEMS (IEPS), 2014, : 215 - 218
  • [9] Robust Gas Pipeline Network Expansion Planning to Support Power System Reliability
    Sundar, Kaarthik
    Misra, Sidhant
    Zlotnik, Anatoly
    Bent, Russell
    2021 AMERICAN CONTROL CONFERENCE (ACC), 2021, : 620 - 627
  • [10] Probabilistic reliability criterion for planning transmission system expansions
    Choi, J.
    Mount, T. D.
    Thomas, R. J.
    Billinton, R.
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) : 719 - 727