共 50 条
- [3] Production lot sizing with quality screening and rework [J]. APPLIED MATHEMATICAL MODELLING, 2016, 40 (04) : 3242 - 3256
- [4] Finite production rate model with backlogging, service level constraint, rework, and random breakdown [J]. 1600, University of Split (30): : 1 - 4
- [8] Production lot sizing with quality screening, rework and shortages backordered [J]. PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2022, 28 (04): : 604 - 612
- [9] Effect of shortage level constraint on finite production rate model with rework [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2008, 67 (02): : 112 - 116