An Application of Analytic Hierarchy Process (AHP) for Sustainable Procurement of Construction Equipment: Multicriteria-Based Decision Framework for Malaysia

被引:55
|
作者
Waris, Muhammad [1 ]
Panigrahi, Shrikant [2 ]
Mengal, Abdullah [3 ]
Soomro, Mujeeb Iqbal [4 ]
Mirjat, Nayyar Hussain [5 ]
Ullah, Mehfooz [1 ]
Azlan, Zarith Sufia [1 ]
Khan, Asadullah [1 ]
机构
[1] Univ Malaysia Pahang, Fac Ind Management, Gambang 26300, Pahang, Malaysia
[2] Univ Buraimi, Coll Business, POB 890,PC 512, Alburaimi, Oman
[3] Balochistan Univ Engn & Technol, Dept Mech Engn, Khuzdar 89100, Balochistan, Pakistan
[4] Mehran Univ Engn & Technol, Dept Mech Engn, SZAB Campus, Khairpur Mirs 66020, Sindh, Pakistan
[5] Mehran Univ Engn & Technol, Dept Elect Engn, Jamshoro 76062, Pakistan
关键词
SUPPLY CHAIN MANAGEMENT; LIFE-CYCLE ASSESSMENT; PUBLIC PROCUREMENT; OPERATIONAL LIFE; PERFORMANCE; ENERGY; MODEL; SELECTION; BARRIERS; SYSTEM;
D O I
10.1155/2019/6391431
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Sustainable procurement is an emerging theme in the construction industry across the globe. However, organizations in the construction industry often encounter impediments in improving environmental performance in construction projects, especially in procurement. Besides its other facets, procurement of construction equipment is inherited to be capital-intensive and vital for managing environmental concerns associated with built environment projects. In this regard, selection criteria in such procurement processes are generally supportive of considering cost and engineering specifications as key parameters. However, sustainability apprehensions in today's Malaysian construction industry have mounted pressure on industry professionals to rethink their equipment acquisition strategies. The notion of green or sustainable procurement is still infancy for the Malaysian construction industry and facing challenges for embedding it in the current procurement practices. This research aims to address these apprehensions by considering six main criteria, namely, life cycle cost (LCC), performance (P), system capability (SC), operational convenience (OC), environmental impact (EI), and social benefits (SBs), and their 38 subcriteria towards procurement of sustainable construction equipment. A multicriteria-based equipment selection framework on the triple bottom line of sustainability in the context of the Malaysian construction industry has been developed and tested. The application of analytical hierarchy process (AHP) established the sustainable procurement index with a consistent sensitivity analysis results. As such, the proposed procurement index shall help decision-makers in the process of the acquisition of sustainable construction equipment in Malaysia.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Review of application of analytic hierarchy process (AHP) in construction
    Darko, Amos
    Chan, Albert Ping Chuen
    Ameyaw, Ernest Effah
    Owusu, Emmanuel Kingsford
    Parn, Erika
    Edwards, David John
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 436 - 452
  • [2] Multicriteria Decision Making and Water Infrastructure: An Application of the Analytic Hierarchy Process for a Sustainable Ranking of Investments
    Macchiaroli, Maria
    Dolores, Luigi
    De Mare, Gianluigi
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (14):
  • [3] A new multicriteria methodology based on Analytic Hierarchy Process: the "Expert" AHP
    De Felice, Fabio
    Petrillo, Antonella
    [J]. INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, 5 (06) : 439 - 445
  • [4] Renewable Energy Scenarios for Sustainable Electricity in Malaysia and the Application of Analytical Hierarchy Process (AHP) for Decision-making
    Yang, Li
    Harun, Irina
    [J]. JURNAL KEJURUTERAAN, 2022, 34 (06): : 1271 - 1279
  • [5] Application of analytic hierarchy process (AHP) for sustainable pavement performance management in Qatar
    Sirin, Okan
    Gunduz, Murat
    Shamiyeh, Mohammed E.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (10) : 3106 - 3122
  • [6] Distributed Load Shedding considering the Multicriteria Decision-Making Based on the Application of the Analytic Hierarchy Process
    Le, Nghia T.
    Nguyen, An T.
    Hoang, Thi Trang
    Vu Nguyen, Hoang Minh
    Quyen, Anh H.
    Phan, Binh T. T.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [7] IMPLEMENTATION OF ANALYTIC HIERARCHY PROCESS (AHP) DECISION MAKING FRAMEWORK FOR BUILDING MAINTENANCE PROCUREMENT SELECTION: CASE STUDY OF MALAYSIAN PUBLIC UNIVERSITIES
    Chua, Shirley Jin Lin
    Ali, Azlan Shah
    Alias, Anuar Bin
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 7 - 18
  • [8] Multicriteria group decision making based on neutrosophic analytic hierarchy process: Suggested modifications
    Abdel-Basset, Mohamed
    Mohamed, Mai
    [J]. Neutrosophic Sets and Systems, 2021, 43 : 247 - 254
  • [9] GIS-based analytic hierarchy process as a multicriteria decision analysis instrument: a review
    Imtiaz Ahmed Chandio
    Abd Nasir B. Matori
    Khamaruzaman B. WanYusof
    Mir Aftab Hussain Talpur
    Abdul-Lateef Balogun
    Dano Umar Lawal
    [J]. Arabian Journal of Geosciences, 2013, 6 : 3059 - 3066
  • [10] Analysing dimensions and indicators to design energy education framework in Malaysia using the analytic hierarchy process (AHP)
    Ilham, Zul
    Subramaniam, Indrani
    Jamaludin, Adi Ainurzaman
    Wan-Mohtar, Wan Abd Al Qadr Imad
    Halim-Lim, Sarina Abdul
    Ohgaki, Hideaki
    Ishihara, Keiichi
    Abu Mansor, Mohd Radzi
    [J]. ENERGY REPORTS, 2022, 8 : 1013 - 1024