A queuing system for inert construction waste management on a reverse logistics network

被引:12
|
作者
Zhang, Xueqing [1 ]
Ahmed, Rana Rabnawaz [1 ,2 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Clear Water Bay, Hong Kong, Peoples R China
[2] NED Univ Engn & Technol, Dept Civil Engn, Karachi 75270, Pakistan
关键词
Inert construction waste; Queuing system; Simulation; Reverse logistics; Performance assessment; ENVIRONMENTAL PERFORMANCE; PROGRAMMING-MODEL; DIESEL VEHICLES; HONG-KONG; SIMULATION; EMISSIONS; REDUCTION; DESIGN; OPTIMIZATION; UNCERTAINTY;
D O I
10.1016/j.autcon.2022.104221
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many cities worldwide have built various types of facilities to manage the large amounts of construction waste generated year by year. One issue of great importance to the operational efficiency of these waste management facilities is the logistics management associated with waste collection and transportation activities. This research develops a queuing system to improve the management of inert construction waste (ICW). This system combines the queuing theory, a reverse logistics network (RLN) and a simulation function. The RLN integrates the sources of waste generation, the collecting and recycling facilities and the landfills, and the simulation function simulates the different processing capacities of the queuing system and the weekday and weekend operations of the facilities in the RLN. Multiple scenarios are considered in evaluating the effect of the queuing delays on the RLN to optimize ICW logistics management across the RLN. A comprehensive case study based on the practice of ICW management in Hong Kong further substantiates the utility of the proposed queuing system.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Multi-layer value stream assessment of the reverse logistics network for inert construction waste management
    Ahmed, Rana Rabnawaz
    Zhang, Xueqing
    RESOURCES CONSERVATION AND RECYCLING, 2021, 170
  • [2] Multi-stage network-based two-type cost minimization for the reverse logistics management of inert construction waste
    Ahmed, Rana Rabnawaz
    Zhang, Xueqing
    Waste Management, 2021, 120 : 805 - 819
  • [3] Multi-stage network-based two-type cost minimization for the reverse logistics management of inert construction waste
    Ahmed, Rana Rabnawaz
    Zhang, Xueqing
    WASTE MANAGEMENT, 2021, 120 : 805 - 819
  • [4] The Study on Construction for Reverse Logistics Network of Waste Household Appliances
    Dai, Zhuo
    Dai, Hongmei
    2015 FIFTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC), 2015, : 793 - 797
  • [5] Reverse logistics of civil construction waste
    da Silva Lopes, Clayton Cappellaro
    Sehnem, Simone
    Lara, Ana Claudia
    Banhal, Alberto Essondon
    NAVUS-REVISTA DE GESTAO E TECNOLOGIA, 2022, 12 : 1 - 17
  • [6] Strategic Analysis of Wood Waste Recycling and Construction of Reverse Logistics Network Model
    Zheng Zhewen
    Lee, Yinghong
    PROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON PUBLIC ECONOMICS AND MANAGEMENT ICPEM 2009, VOL 6: COST BENEFITS ANALYSIS, 2009, : 280 - 286
  • [7] Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal
    Xu, Jiuping
    Shi, Yi
    Zhao, Siwei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (02)
  • [8] Network construction of Waste reverse Logistics in Developing China's New Rural Areas
    Huang, Zhiqiang
    Guo, Yun
    ADVANCES IN MECHANICAL ENGINEERING, PTS 1-3, 2011, 52-54 : 2203 - +
  • [9] Construction of reverse logistics management information system based on internet of things
    Zhu, Shiping, 1600, TeknoScienze, Viale Brianza,22, Milano, 20127, Italy (28):
  • [10] Construction of Reverse Logistics Management Information System Based on Internet of Things
    Zhu Shiping
    Wang Yumei
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (03): : 738 - 742