Research on Influencing Factors of Selecting Construction Agent Based on Project Governance

被引:2
|
作者
Yan Ling [1 ]
Xing Ran [1 ]
机构
[1] Tianjin Univ Technol, Sch Management, Tianjin, Peoples R China
关键词
Project governance; construction agent; selection; influencing factor; construction agent list;
D O I
10.1109/IEEM.2009.5373250
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Agent construction system to non-profit government investment project has just been launched in China, and many issues are to be settled urgently, one of which is the selection of construction agent. Some problems of selecting construction agent are found by statistical analyses, such as the lack of the selection procedure regulation, evaluation information disclosure, and so on. Solving the above problems by introducing project governance, this paper analyzes the competence of government supervision and project characteristics from internal governance, and analyzes the competence of construction agent and the maturity of agent construction market from external governance. Then the strategies of the selecting construction agent are given. Furthermore, considering the defect of agent market and the reduction in searching costs, construction agent list based on reputation mechanism of external governance should be established, which is a valid way to make up for the defect resulting from immature agent market.
引用
收藏
页码:654 / 659
页数:6
相关论文
共 50 条
  • [1] Research on the Agent Construction Service Reward from the Perspective of Project Governance
    Ling, Yan
    Jin, Xu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 391 - 394
  • [2] Research on the Institutional Innovation of Agent Construction System for Government Investment Project: A Perspective of Critical Governance Factors
    Yin Yilin
    Yan Min
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1830 - 1834
  • [3] Research on the Method of Selecting Project Governance Subject
    Ding, Ronggui
    Ye, Peng
    Wang, Yanwei
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 1125 - 1130
  • [4] Research on the Governance of Agent Construction Project from the Perspective of Transaction Cost Theory
    Liao, Cuicheng
    Zhong, Jie
    Luo, Yazhuo
    Hu, Jiawen
    ICCREM 2021: CHALLENGES OF THE CONSTRUCTION INDUSTRY UNDER THE PANDEMIC, 2021, : 470 - 478
  • [5] The improvement of agent-construction system in public project in China based on project governance
    Yan, Link
    Yin, Yilin
    Shao, Yingying
    Proceedings of IRNOP VII Project Research Conference, 2006, : 70 - 81
  • [6] Research on Factors Influencing Project Delivery System selection for Construction Projects
    Liu, Bingsheng
    Fu, Meiqing
    Shen, Geoffrey
    Tai, Shuangliang
    Zhang, Shiruo
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 292 - 302
  • [7] Research Frame for Incentive Mechanism of the Construction Agent in Government Investment Project: from the Perspective of Project Governance
    Yan Ling
    Yang Linggang
    Zhao Hua
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1513 - 1517
  • [8] Agent incentive empirical research based on key governance factors: Taking project ownership as the manipulated variable
    Yan, L. (lingyantj@163.com), 1600, Chinese Society of Civil Engineering (47):
  • [9] Research on the Relational Governance of Construction Project Transaction
    Cheng Zusong
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1922 - 1926
  • [10] Influencing Factors and Countermeasures of Construction Project Management
    Zhou Lihong
    Fu Longlong
    2018 7TH INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS AND COMPUTER SCIENCE (ICAMCS 2018), 2019, : 464 - 467