Numerical Simulation Analysis on Construction Process of Pile Method Pilot Tunnel of a Subway Station in Xi ' an

被引:1
|
作者
Wang, Zhao-Jun [1 ]
Ren, Jian-Xi [2 ]
Chi-gan, Xiang-Ming [1 ]
Zhang, Liang [2 ]
Zhang, Yang [1 ]
机构
[1] China Construct Third Engn Bur Grp Co, Wuhan, Hubei, Peoples R China
[2] Xian Univ Sci & Technol, Civil & Architecture Engn, Xian, Shaanxi, Peoples R China
关键词
underground station; PBA method; ground settlement; FLAC simulation;
D O I
10.1109/ICHCE57331.2022.10042777
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The emergence of subway greatly reduces the pressure of urban traffic, PBA construction method can effectively reduce the subway station construction induced surface subsidence, is one of the preferred construction method of urban subway station construction under complex ground conditions. In order to explore the law of surface subsidence induced by different excavation steps of PBA method in loess area, a three-dimensional model of subway station was established by using finite difference software FLAC based on a subway station in Xi 'an. The simulation analysis of ground settlement caused by different excavation sequences were completed, and the field deformation monitoring scheme was executed. The FLAC simulation shows that the maximum settlement of ground settlement caused by the two construction sequences of "from bottom to top" and "from top to bottom" is located at the center line of the station, and the settlement curve is in a "V" shape. The displacement of deep soil mass in the pilot tunnel "from bottom to top" construction is small, and the variation of soil structure and interaction force is small, which is convenient to control the ground settlement. The results of engineering measurement are basically consistent with those predicted by FLAC, and the FLAC simulation calculation of ground subsidence law is reasonable and effective.
引用
收藏
页码:664 / 667
页数:4
相关论文
共 50 条
  • [1] NUMERICAL ANALYSIS OF EXCAVATION METHOD FOR A SUBWAY UNDERMINE STATION PILOT TUNNEL IN BEIJING
    Xie, Jinshui
    Bai, Mingzhou
    Kuang, Xing
    Du, Yanqing
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 607 - 614
  • [2] Dynamic Simulation Analysis of Large Space Subway Station Construction with Cavern-Pile Method
    Gong, Zhiqun
    Zhang, Fen
    Zhang, Yantao
    Gong, Yijun
    Gao, Dongbo
    [J]. ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (05): : 1345 - 1361
  • [3] Construction optimization and settlement analysis of Pile Beam Arc method in subway station
    Geng, Dongyang
    Wang, Hongbo
    Zhu, Kunfeng
    Qi, Wanpeng
    Liang, Xiufeng
    [J]. WAVES IN RANDOM AND COMPLEX MEDIA, 2022,
  • [4] Numerical Simulation on Top-down Construction Method of Subway Station in Hefei
    Ding, Kewei
    Guo, Naiyang
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 1731 - 1734
  • [5] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
    Liu, Xinrong
    Liu, Yongquan
    Yang, Zhongping
    He, Chunmei
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) : 1690 - 1705
  • [6] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
    Xinrong Liu
    Yongquan Liu
    Zhongping Yang
    Chunmei He
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1690 - 1705
  • [7] Numerical Simulation onCrossing Construction of Subway Station Under Building
    Wang Chengbing
    Gao Wensheng
    [J]. ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 567 - 572
  • [8] Technology of pile foundation underpinning in Shield tunnel of Xi'an Subway
    Ma, Lan
    Wang, Jing
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1445 - 1448
  • [9] Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network
    Ma, Qiangqiang
    Li, Wentao
    Zhang, Yongjun
    [J]. SCIENTIFIC PROGRAMMING, 2021, 2021
  • [10] Numerical simulation analysis of the construction mechanics in the process of tunnel excavation
    Li, Dongbo
    Zhao, Dong
    Liu, Chunyan
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 1590 - 1595