共 50 条
- [1] NUMERICAL ANALYSIS OF EXCAVATION METHOD FOR A SUBWAY UNDERMINE STATION PILOT TUNNEL IN BEIJING [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 607 - 614
- [2] Dynamic Simulation Analysis of Large Space Subway Station Construction with Cavern-Pile Method [J]. ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (05): : 1345 - 1361
- [4] Numerical Simulation on Top-down Construction Method of Subway Station in Hefei [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 1731 - 1734
- [6] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1690 - 1705
- [7] Numerical Simulation onCrossing Construction of Subway Station Under Building [J]. ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 567 - 572
- [8] Technology of pile foundation underpinning in Shield tunnel of Xi'an Subway [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1445 - 1448
- [10] Numerical simulation analysis of the construction mechanics in the process of tunnel excavation [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 1590 - 1595