Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea

被引:122
|
作者
Won, Jongsung [1 ]
Cheng, Jack C. P. [1 ]
Lee, Ghang [2 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[2] Yonsei Univ, Dept Architectural Engn, Seoul 120749, South Korea
关键词
Construction waste; Building information modeling (BIM); BIM-based design validation; Quantification; Prevention; Likelihood; LEAN CONSTRUCTION; SUSTAINABILITY; REDUCTION;
D O I
10.1016/j.wasman.2015.12.026
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Waste generated in construction and demolition processes comprised around 50% of the solid waste in South Korea in 2013. Many cases show that design validation based on building information modeling (BIM) is an effective means to reduce the amount of construction waste since construction waste is mainly generated due to improper design and unexpected changes in the design and construction phases. However, the amount of construction waste that could be avoided by adopting BIM-based design validation has been unknown. This paper aims to estimate the amount of construction waste prevented by a BIM-based design validation process based on the amount of construction waste that might be generated due to design errors. Two project cases in South Korea were studied in this paper, with 381 and 136 design errors detected, respectively during the BIM-based design validation. Each design error was categorized according to its cause and the likelihood of detection before construction. The case studies show that BIM-based design validation could prevent 4.3-15.2% of construction waste that might have been generated without using BIM. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:170 / 180
页数:11
相关论文
共 50 条
  • [1] Quantification of Construction Waste in Early Design Stages Using Bim-Based Tool
    Quinones, Rocio
    Llatas, Carmen
    Victoria Montes, Maria
    Cortes, Isidro
    RECYCLING, 2022, 7 (05)
  • [2] A BIM-Based construction and demolition waste information management system for greenhouse gas quantification and reduction
    Xu, Jiuping
    Shi, Yi
    Xie, Yachen
    Zhao, Siwei
    JOURNAL OF CLEANER PRODUCTION, 2019, 229 : 308 - 324
  • [3] BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams
    Guerra, Beatriz C.
    Bakchan, Amal
    Leite, Fernanda
    Faust, Kasey M.
    WASTE MANAGEMENT, 2019, 87 : 825 - 832
  • [4] BIM-Based Automated Drainage System Design in Prefabrication Construction
    Zhang, Nan
    Tian, Yichen
    Wang, Jingwen
    Al-Hussein, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1146 - 1155
  • [5] BIM-Based Tools for Managing Construction and Demolition Waste (CDW): A Scoping Review
    Nikmehr, Bahareh
    Hosseini, M. Reza
    Wang, Jun
    Chileshe, Nicholas
    Rameezdeen, Raufdeen
    SUSTAINABILITY, 2021, 13 (15)
  • [6] BIM-BASED QUALITY CONTROL FOR SAFETY ISSUES IN THE DESIGN AND CONSTRUCTION PHASES
    Park, Seunghwa
    Kim, Inhan
    ARCHNET-IJAR INTERNATIONAL JOURNAL OF ARCHITECTURAL RESEARCH, 2015, 9 (03) : 111 - 129
  • [7] Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management
    Zoghi, Milad
    Kim, Sungjin
    SUSTAINABILITY, 2020, 12 (06)
  • [8] BIM-BASED DESIGN COORDINATION FOR CHINA'S ARCHITECTURE, ENGINEERING AND CONSTRUCTION INDUSTRY
    Chen, Chao
    Yang, Lin
    Tang, Llewellyn
    Jiang, Haotian
    BUILDING INFORMATION MODELLING (BIM) IN DESIGN, CONSTRUCTION AND OPERATIONS II, 2017, 169 : 211 - 219
  • [9] Quantitative impact analysis of priority policy applied to BIM-based design validation
    Huh, Seung-Ha
    Ham, Namhyuk
    Kim, Ju-Hyung
    Kim, Jae-Jun
    AUTOMATION IN CONSTRUCTION, 2023, 154
  • [10] BIM-based steel reinforcing bar detail construction design and picking optimization
    Lien, Li-Chuan
    Dolgorsuren, Unurjargal
    STRUCTURES, 2023, 49 : 520 - 536