Long-term performance of nutrient removal in an integrated constructed wetland

被引:18
|
作者
Zhu, Yinuo [1 ,2 ,3 ]
Cui, Lijuan [1 ,2 ,3 ]
Li, Jing [1 ,2 ,3 ]
Wang, Rumiao [1 ,2 ,3 ]
Vymazal, Jan [4 ]
Li, Wei [1 ,2 ,3 ]
Lei, Yinru [1 ,2 ,3 ]
Zhang, Manyin [1 ,2 ,3 ]
Hao, Ting [1 ,2 ,3 ]
Wei, Jiaming [5 ]
机构
[1] Chinese Acad Forestry, Inst Wetland Res, Beijing 100091, Peoples R China
[2] Beijing Key Lab Wetland Ecol Funct & Restorat, Beijing 100091, Peoples R China
[3] Beijing Hanshiqiao Natl Wetland Ecosyst Res Stn, Beijing 101399, Peoples R China
[4] Czech Univ Life Sci Prague, Fac Environm Sci, Kamycka 129, Prague 16521 6, Czech Republic
[5] Environm Remediat Co Ltd, Natl Engn Lab Site Remediat Technol, Beijing Construct Engn Grp, Beijing 100015, Peoples R China
基金
北京市自然科学基金;
关键词
Constructed wetland; Long-term performance; Nitrogen and phosphorus removal; Bacterial community; WASTE-WATER TREATMENT; BACTERIAL COMMUNITY STRUCTURE; NITROGEN REMOVAL; FRESH-WATER; PHOSPHORUS; DYNAMICS; VEGETATION; GROWTH; DENITRIFICATION; EUTROPHICATION;
D O I
10.1016/j.scitotenv.2021.146268
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Constructed wetlands (CWs) have been regarded as efficient technologies for both wastewater treatment and reuse of water resources. Most studies on CW treatment efficiency are limited to a short-term perspective, and there are still many unknowns about the long-term performance of CWs. Here we evaluated the performance of an integrated CW that has been in operation for more than ten years. The average removal rates of TN and TP were maintained at 53.6% and 67.3% over 10 years, respectively. The annual mass reductions in TN and TP reached 937.5 kg ha(-1) yr(-1) and 303.2 kg ha(-1) yr(-1), respectively. In addition, TN removal rate was significantly higher in summer and autumn than those in spring, yet there was no seasonal difference in TP removal. The bacterial richness and diversity in summer and autumn were higher than those in spring. TN and TOC not only determine the bacterial community structure, but also affect the removal efficiency of CW. Denitrification and dephosphorization microorganisms were enriched and accounted for a considerable proportion (21.14-52.85%) in the bacterial community. In addition, the relative abundance of Pseudomonas was significantly positively related with the rate of TN and TP removal. (C) 2021 Published by Elsevier B.V.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Long-Term Performance of a Constructed Wetland for Metal Removal
    Knox, Anna Sophia
    Nelson, Eric A.
    Halverson, Nancy V.
    Gladden, John B.
    [J]. SOIL & SEDIMENT CONTAMINATION, 2010, 19 (06): : 667 - 685
  • [2] Long-term performance of an integrated constructed wetland for advanced treatment of mixed wastewater
    Wu, Yinghai
    Han, Rui
    Yang, Xunan
    Zhang, Yukui
    Zhang, Renduo
    [J]. ECOLOGICAL ENGINEERING, 2017, 99 : 91 - 98
  • [3] Long-term performance of a representative integrated constructed wetland treating farmyard runoff
    Mustafa, Atif
    Scholz, Miklas
    Harrington, Rory
    Carroll, Paul
    [J]. ECOLOGICAL ENGINEERING, 2009, 35 (05) : 779 - 790
  • [4] Long-Term Trends in Nitrogen Removal by an Aridland Constructed Treatment Wetland
    Treese, Sawyer
    Childers, Daniel L.
    Sanchez, Christopher A.
    [J]. WETLANDS, 2020, 40 (06) : 2071 - 2083
  • [5] Long-Term Trends in Nitrogen Removal by an Aridland Constructed Treatment Wetland
    Sawyer Treese
    Daniel L. Childers
    Christopher A. Sanchez
    [J]. Wetlands, 2020, 40 : 2071 - 2083
  • [6] Removal of nitrogen from low pollution water by long-term operation of an integrated vertical-flow constructed wetland: Performance and mechanism
    Liu, Ying
    Liu, Xiaohui
    Li, Ke
    Lu, Shaoyong
    Guo, Xiaochun
    Zhang, Jian
    Xi, Beidou
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 652 : 977 - 988
  • [7] NUTRIENT REMOVAL AND DISINFECTION PERFORMANCE IN THE BYRON BAY CONSTRUCTED WETLAND SYSTEM
    BAVOR, HJ
    ANDEL, EF
    [J]. WATER SCIENCE AND TECHNOLOGY, 1994, 29 (04) : 201 - 208
  • [8] Long-term performance of a constructed wetland/filter basin system treating wastewater
    Lazareva, O.
    Pichler, T.
    [J]. GEOCHIMICA ET COSMOCHIMICA ACTA, 2008, 72 (12) : A522 - A522
  • [9] Long-term performance of aerated and planted constructed wetland treatment on domestic wastewater
    Lv, Jingjing
    Hou, Li'an
    Zhang, Lieyu
    Xi, Beidou
    Mao, Xuhui
    Wu, Yiwen
    [J]. DESALINATION AND WATER TREATMENT, 2017, 64 : 64 - 71
  • [10] Assessment of long-term phosphorus retention in an integrated constructed wetland treating domestic wastewater
    Mawuli Dzakpasu
    Miklas Scholz
    Valerie McCarthy
    Siobhán N. Jordan
    [J]. Environmental Science and Pollution Research, 2015, 22 : 305 - 313