AHP-Based Weighting Factors Affecting Electrical Safety on Construction Sites

被引:0
|
作者
Kan Hongsheng [1 ]
Zhao Jinxian [2 ]
Zhang Ying [3 ]
Liang Jinfeng [4 ]
机构
[1] Qingdao Technol Univ, Qingdao 266520, Peoples R China
[2] Qingdao Technol Univ, Sch Management, Qingdao 266520, Peoples R China
[3] Shandong Construct Technol Dev Training Ctr, Jinan 250011, Shandong, Peoples R China
[4] Qingjian Grp Co Ltd, Qingdao 266071, Peoples R China
关键词
temporary electrical safety; AHP; weight;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
According to statistical data from 1990 to 1999, electronic shock accident accounts for 18% and is second highest among all casualty accidents in China. Compared to developed countries, such as America, the number of casualty and its proportion is much higher. So there is a big room for improvement with respect to temporary electrical safety of construction sites. Before taking measure, risk identification and factor weighting is necessary. AHP method is often used in the course of risk assessment in construction industry. It is a mature mathematical disposal of expert's subjective estimation. This paper studies the application of AHP method to elicit knowledge from experts and formalize it into a set of weighted safety factors. It will help construction manager to improve construction safety.
引用
收藏
页码:155 / +
页数:2
相关论文
共 50 条
  • [1] AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes
    Shapira, Aviad
    Simcha, Meir
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (04) : 307 - 318
  • [2] A Method Combined Entropy with AHP Weighting Factors Affecting Safety on Construction Sites
    Zhao Jinxian
    Kan Hongsheng
    Liang Jinfeng
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1403 - 1407
  • [3] Factors affecting the safety performance of contractors and construction sites
    Wong, KW
    Chan, PC
    Lo, KK
    [J]. IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1999, : 19 - 24
  • [4] AHP-Based Research on the Selection of Construction Project Subcontractor
    Cheng, Min
    Ma, Guangxia
    Sun, Jinkun
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 3035 - 3039
  • [5] AHP-based equipment selection model for construction projects
    Shapira, A
    Goldenberg, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (12): : 1263 - 1273
  • [6] AHP-based analysis of the risk potential of safety incidents: Case study of cranes in the construction industry
    Raviv, Gabriel
    Shapira, Aviad
    Fishbain, Barak
    [J]. SAFETY SCIENCE, 2017, 91 : 298 - 309
  • [7] An ANP- and AHP-based approach for weighting criteria in public works bidding
    Pastor-Ferrando, J. P.
    Aragones-Beltran, P.
    Hospitaler-Perez, A.
    Garcia-Melon, M.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (06) : 905 - 916
  • [8] Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes
    Shapira, Aviad
    Lyachin, Beny
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (01) : 24 - 33
  • [9] The Construction of AHP-based Evaluation System of Teacher's Ability
    Yang Chao
    Liu Jun
    [J]. COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2009, : 1045 - 1050
  • [10] Novel AHP-based QoE Factors' Selection Approach
    Ben Youssef, Yosr
    Afif, Meriem
    Tabbane, Sami
    [J]. 2016 IEEE/ACS 13TH INTERNATIONAL CONFERENCE OF COMPUTER SYSTEMS AND APPLICATIONS (AICCSA), 2016,