Simultaneous Scheduling and Routing of Pipeless Plants in Different Layouts

被引:2
|
作者
Shaik, Munawar A. [1 ]
Mathur, Pulkit [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Chem Engn, New Delhi 110016, India
关键词
BATCH PLANTS; OPERATION;
D O I
10.1021/acs.iecr.8b00799
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this work, simultaneous scheduling and vessel routing problem of pipeless plants is addressed with different layouts of units/stations. A general framework is presented for optimization of pipeless plants, which includes guidelines for state-task-network development covering issues such as when to consider vessels as states and how to handle vessel routing. The proposed formulation has been illustrated using two case studies drawn from the literature. For the demonstration of the proposed simultaneous approach, three different layouts: linear, herringbone, and circular, are considered in example 1 with three vessels. The herringbone layout results in better makespan value, as expected. The second case study is relatively large with six vessels and is solved for the herringbone layout for the different number of vessels.
引用
收藏
页码:9527 / 9536
页数:10
相关论文
共 50 条
  • [1] Integrating routing and scheduling for pipeless plants in different layouts
    Huang, W
    Chung, PWH
    COMPUTERS & CHEMICAL ENGINEERING, 2005, 29 (05) : 1069 - 1081
  • [2] Integration of Scheduling and Vessel Routing in Pipeless Plants
    Shaik, Munawar A.
    Mathur, Pulkit
    12TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING AND 25TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT C, 2015, 37 : 1925 - 1930
  • [3] Simultaneous design, layout and scheduling of pipeless batch plants
    Realff, MJ
    Shah, N
    Pantelides, CC
    COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 (6-7) : 869 - 883
  • [4] Simultaneous design, layout and scheduling of pipeless batch plants
    Realff, M.J.
    Shah, N.
    Pantelides, C.C.
    Computers and Chemical Engineering, 1996, 20 (6-7): : 869 - 883
  • [5] Generalization of Scheduling Models for Batch Plants and Pipeless Plants
    Shaik, M. A.
    Mathur, P.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2019, 58 (19) : 8195 - 8205
  • [6] SHORT-TERM SCHEDULING OF PIPELESS BATCH PLANTS
    PANTELIDES, CC
    REALFF, MJ
    SHAH, N
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1995, 73 (A4): : 431 - 444
  • [7] Short-term scheduling of pipeless batch plants
    Pantelides, CC
    Realff, MJ
    Shah, N
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1997, 75 : S156 - S169
  • [8] Short-term scheduling of pipeless batch plants
    Pantelides, C.C.
    Realff, M.J.
    Shah, N.
    Chemical Engineering Research and Design, 1995, 73 (A4): : 431 - 444
  • [9] Scheduling of pipeless batch plants using constraint satisfaction techniques
    Huang, W
    Chung, PWH
    COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (2-7) : 377 - 383
  • [10] PIPELESS PLANTS
    PEARSON, WK
    CHEMICAL ENGINEERING, 1992, 99 (10) : 9 - 9