Optimal project portfolio selection with reinvestment strategy considering sustainability in an uncertain environment: a multi-objective optimization approach

被引:9
|
作者
Zarjou, Mohammadali [1 ]
Khalilzadeh, Mohammad [2 ,3 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Ind Engn, Tehran, Iran
[2] CENTRUM Catolica Grad Business Sch, Lima, Peru
[3] Pontificia Univ Catolica Peru, Lima, Peru
关键词
Project portfolio selection; Sustainability; Mathematical programming model; Fuzzy BWM; Reinvestment strategy; Construction projects; CONSTRUCTION; MANAGEMENT; INDICATORS; MODEL; PRIORITIZATION; METHODOLOGY; PROCUREMENT; DESIGN; CHINA;
D O I
10.1108/K-11-2020-0737
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose This study aims to develop a model for project portfolio selection considering organizational goals such as budgets, sustainability cash flow and reinvestment strategy under an uncertain environment. Design/methodology/approach A multi-objective mathematical programming model is proposed for project selection, which takes the social, environmental and financial aspects into account as the objectives of the project portfolio selection problem. The project evaluation and selection process in one of the large capitals in the Middle East with numerous urban construction projects was considered as a real case study, in which the subjects of environmental and social sustainability are of great importance. Then, the most significant criteria for project evaluation and selection based on sustainability were identified and ranked using the fuzzy best-worst method (BWM). Findings The criterion of "defining clear and real objectives" was ranked first, "project investment return period" was ranked second, "minimum changes in the predicted range" was ranked third, and the other ten sustainability indicators were ranked as well. Next, the presented mathematical programming model was solved using the augmented e-constraint method. The sensitivity analysis indicated that increasing the amount of investments in projects would increase their net present value. Also, increased investment had no effect on sustainability, while decreased investment caused sustainability to not being optimal. Originality/value This study focuses on the impact of the amount of investments on projects, and the associated costs of sustainable projects. Further to the authors' knowledge, there has been no relevant study taking uncertainty into account. Also, very few studies proposed a mathematical programming model for the project portfolio selection problem. Moreover, this research uses the brainstorming and Delphi method to identify the sustainability indicators influencing the organization and screens the evaluation indicators. Furthermore, the weights of the evaluation indicators are determined using the fuzzy BWM based on the consistency of opinions.
引用
收藏
页码:2437 / 2460
页数:24
相关论文
共 50 条
  • [1] Sustainable project selection: Optimal project selection considering sustainability under reinvestment strategy
    Kudratova, Shamsiya
    Huang, Xiaoxia
    Zhou, Xiaoguang
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 203 : 469 - 481
  • [2] Multi-objective uncertain project selection considering synergy
    Huang, Xiaoxia
    Hong, Kwon Ryong
    Kim, Jang Su
    Choe, Il Jong
    [J]. INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2022, 13 (08) : 2383 - 2402
  • [3] Multi-objective uncertain project selection considering synergy
    Xiaoxia Huang
    Kwon Ryong Hong
    Jang Su Kim
    Il Jong Choe
    [J]. International Journal of Machine Learning and Cybernetics, 2022, 13 : 2383 - 2402
  • [4] OPTIMAL MIXED PROJECT and SECURITY PORTFOLIO SELECTION UNDER REINVESTMENT STRATEGY
    Huang, Xiaoxia
    You, Yuanqiong
    [J]. 2017 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATION (ICIMSA 2017), 2017, : 5 - 9
  • [5] NPD project portfolio selection using reinvestment strategy in competitive environment
    Ghassemi, Alireza
    Amalnick, Mohsen Sadegh
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (01) : 47 - 62
  • [6] An interactive multi-objective programming approach for project portfolio selection and scheduling
    Şahin Zorluoğlu, Özge
    Kabak, Özgür
    [J]. Computers and Industrial Engineering, 2022, 169
  • [7] An interactive multi-objective programming approach for project portfolio selection and scheduling
    Zorluoglu, Ozge Sahin
    Kabak, Ozgur
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [8] A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting
    RezaHoseini, Ali
    Ghannadpour, Seyed Farid
    Hemmati, Maryam
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 269
  • [9] Multi-objective portfolio selection considering expected and total utility
    Wang, Xianhe
    Ouyang, Yuliang
    Li, You
    Liu, Shu
    Teng, Long
    Wang, Bo
    [J]. FINANCE RESEARCH LETTERS, 2023, 58
  • [10] A two-stage sustainable uncertain multi-objective portfolio selection and scheduling considering conflicting criteria
    Ramedani, Amir Mohammad
    Mehrabian, Ahmad
    Didehkhani, Hosein
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 132