Optimization of a large industrial wastewater treatment plant using a modeling approach: A case study

被引:22
|
作者
Muoio, Roberta [1 ]
Palli, Laura [1 ]
Ducci, Iacopo [1 ]
Coppini, Ester [2 ]
Bettazzi, Elena [2 ]
Daddi, Daniele [2 ]
Fibbi, Donatella [2 ]
Gori, Riccardo [1 ]
机构
[1] Univ Florence, Dept Civil & Environm Engn, Via Santa Marta 3, Florence, Italy
[2] GIDA SpA, Via Baciacavallo 36, Prato, Italy
关键词
Sewage sludge; Wastewater treatment plant; Case study; Cost optimization; West by DHI; Modeling; OPERATION; DESIGN; STATE;
D O I
10.1016/j.jenvman.2019.109436
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The objective of this paper is to find the optimum solid retention time (SRT) of a wastewater treatment plant (WWTP), which minimizes operating costs, using a modeling approach with WEST software by MIKE DHI (R). For the determination of the kinetic and stoichiometric parameters (used for the correct calibration of the model implemented), respirometric and kinetic batch tests were carried out. Each Oxidation ditch was modeled by a sequence of four aerated activated sludge units (ASUs) and four anoxic ASUs with recirculation. The model is able to simulate the separation efficiency of the secondary settler, which is generally quite low: in fact, the industrial origin of the wastewater induces the formation of small flocs, the dimensions of which can be further reduced by the presence of surface aerators. The nitrification/denitrification process is also accurately predicted. Using data obtained from the model, mass balances at the steady state for COD and N were made and compared to the ones obtained using measured data. After calibration and validation of the model, steady-state simulations were carried out by increasing and decreasing the SRT of the system under two different operational conditions used by the managing company and by evaluating the costs related to the water treatment line and the sludge treatment line for each scenario. It is interesting to note how the total costs are lower in summer than in winter (7.2 (sic)cent/m(3) in summer and 8.7 (sic)cent/m(3) in winter, in scenario 0). In general, the increase in the SRT led to a decrease in the total management costs. In fact, differences between scenario 0 and the scenario with the lowest total treatment costs (corresponding to an SRT of 11.4 d in winter and 10.0 din summer) could give rise to total savings of about 44.000(sic)/year in summer and 93.000(sic)/year in winter.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Simulation of the influence of industrial wastewater on a municipal sewage treatment plant—a case study
    Ákos Rédey
    Viola Somogyi
    József Ányos
    Endre Domokos
    Péter Thury
    Tatiana Yuzhakova
    [J]. Environmental Science and Pollution Research, 2011, 18 : 192 - 198
  • [2] New approach for data evaluation of industrial wastewater treatment plant: methodology and case study for a coke and steel-processing plant
    Drakides, Christian
    Lay-Son, Meiling
    [J]. WATER SCIENCE AND TECHNOLOGY, 2009, 60 (11) : 2897 - 2903
  • [3] EVALUATION OF THE SUCCESS OF THE TOFU INDUSTRIAL WASTEWATER TREATMENT PLANT USING STRUCTURAL EQUATION MODELING
    Widiyanto, Arif
    Masduqi, Ali
    Otok, Bambang Widjanarko
    Assomadi, Abdu Fadli
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2023, 25 (110): : 59 - 66
  • [4] Evaluating the process efficiency of industrial wastewater treatment plants using data envelopment analysis approach case study: Khuzestan steel company treatment plant
    Rahbari, K.
    Hassani, A. H.
    Mehrgan, M. R.
    Javid, A. H.
    [J]. BULGARIAN CHEMICAL COMMUNICATIONS, 2018, 50 (01): : 124 - 132
  • [5] Optimization of Tunisian wastewater treatment plant - the Kelibia case
    Hayet, Cherif
    Youssef, Touhami
    Hédi, Shayeb
    Moktar, Hamdi
    [J]. Sustainable Environment Research, 2011, 21 (01) : 65 - 72
  • [6] Dynamic Failure Risk Assessment of Wastewater Treatment and Reclamation Plant: An Industrial Case Study
    Analouei, Razieh
    Taheriyoun, Masoud
    Amin, Md Tanjin
    [J]. SAFETY, 2022, 8 (04)
  • [7] Simulation of the influence of industrial wastewater on a municipal sewage treatment plant-a case study
    Redey, Akos
    Somogyi, Viola
    Anyos, Jozsef
    Domokos, Endre
    Thury, Peter
    Yuzhakova, Tatiana
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2011, 18 (02) : 192 - 198
  • [8] DYNAMIC MODELING OF INDUSTRIAL WASTEWATER-TREATMENT PLANT-DATA
    HANSEN, JL
    FIOK, AE
    HOVIOUS, JC
    [J]. JOURNAL WATER POLLUTION CONTROL FEDERATION, 1980, 52 (07): : 1966 - 1975
  • [9] Carbamazepine and oxcarbazepine removal in pharmaceutical wastewater treatment plant using a mass balance approach: A case study
    Kshitiz Dwivedi
    Amruta Morone
    Vishwas Pratape
    Tapan Chakrabarti
    Ram Avtar Pandey
    [J]. Korean Journal of Chemical Engineering, 2017, 34 : 2662 - 2671
  • [10] Carbamazepine and oxcarbazepine removal in pharmaceutical wastewater treatment plant using a mass balance approach: A case study
    Dwivedi, Kshitiz
    Morone, Amruta
    Pratape, Vishwas
    Chakrabarti, Tapan
    Pandey, Ram Avtar
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2017, 34 (10) : 2662 - 2671