Start-up of three-phase rectification columns: Simulation and experiment

被引:1
|
作者
Tran, TK [1 ]
Repke, JU [1 ]
Wozny, G [1 ]
机构
[1] Tech Univ Berlin, Sekr KWT 9, D-10623 Berlin, Germany
关键词
D O I
10.1002/cite.200390038
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
引用
收藏
页码:194 / 199
页数:6
相关论文
共 50 条
  • [1] Three-phase rectification in packed columns
    Siegert, M
    Stichlmair, J
    Repke, JU
    Wozny, G
    [J]. CHEMIE INGENIEUR TECHNIK, 1999, 71 (08) : 819 - 823
  • [2] Dynamic simulation of start-up procedures of reactive distillation columns
    Scenna, NJ
    Ruiz, CA
    Benz, SJ
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 : S719 - S722
  • [3] Start-up Procedure for Three-Phase Six-Switch Boost PFC Rectifier
    Kumar, Misha
    Huber, Laszlo
    Jovanovic, Milan M.
    [J]. 2014 TWENTY-NINTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION (APEC), 2014, : 1852 - 1859
  • [4] Analysis of the start-up process in reactive rectification
    Reepmeyer, F
    Repke, JU
    Wozny, G
    [J]. CHEMIE INGENIEUR TECHNIK, 2002, 74 (09) : 1253 - 1258
  • [5] CALCULATION OF CONTINUOUSLY WORKING DISTILATION COLUMNS BY SIMULATION OF START-UP PROCEDURE
    KETCHUM, R
    ONKEN, U
    [J]. CHEMIE INGENIEUR TECHNIK, 1970, 42 (9-10) : 707 - &
  • [6] Restraint of Start-up Inrush Current of Three-phase VSI Based on Virtual Damping Control
    He, Kaizhong
    Su, Hongsheng
    Jiang, Kun
    Zeng, Hanghang
    [J]. Gaodianya Jishu/High Voltage Engineering, 2020, 46 (03): : 1068 - 1076
  • [7] Start-up strategy for the LHCb experiment
    Lanfranchi, G.
    [J]. NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA B-GENERAL PHYSICS RELATIVITY ASTRONOMY AND MATHEMATICAL PHYSICS AND METHODS, 2008, 123 (3-4): : 303 - 309
  • [8] Advanced start-up strategy of an anaerobic three-phase turbulent bed reactor treating winery wastewaters
    Cresson, R
    Carrère, H
    Bernet, N
    Delgenès, JP
    [J]. JOURNAL OF BIOTECHNOLOGY, 2005, 118 : S180 - S180
  • [9] Beyond the start-up phase
    Satyanarayanan, M
    [J]. IEEE PERVASIVE COMPUTING, 2004, 3 (01) : 2 - 4
  • [10] Current Stress Optimisation Strategy for Three-phase Dual Active Bridge Converter during the Start-Up Process
    Chen, Guofu
    Mu, Xiaobin
    Wang, Xiang
    Jiao, Honglin
    Hao, Ruixiang
    Zhu, Wu
    [J]. 2020 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL, AUTOMATION AND MECHANICAL ENGINEERING, 2020, 1626