Two-agent group scheduling with deteriorating jobs on a single machine

被引:41
|
作者
Liu, Peng [1 ,2 ]
Tang, Lixin [1 ]
Zhou, Xiaoye [2 ]
机构
[1] Northeastern Univ, Logist Inst, Liaoning Key Lab Mfg Syst & Logist, Shenyang 110004, Peoples R China
[2] Shenyang Univ Technol, Sch Management, Shenyang 110178, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Two-agent; Deteriorating jobs; Group technology; Single machine; PROCESSING TIMES; MINIMIZE; SETUP;
D O I
10.1007/s00170-009-2224-3
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper considers the two-agent scheduling problems with deteriorating jobs and group technology on a single machine, where the objective is to minimize the total completion time of the first agent with the restriction that the maximum cost of the second agent cannot exceed a given upper bound. Two agents compete to perform their respective jobs on a common single machine, and each agent has his own criterion to optimize. We introduce deteriorating jobs and group technology into the two-agent single-machine scheduling where the job processing times and group setup times are both functions of their starting times. There are two different linear deterioration functions. We propose the optimal properties and present the optimal polynomial time algorithms for two different scheduling problems, respectively.
引用
收藏
页码:657 / 664
页数:8
相关论文
共 50 条
  • [1] Two-agent group scheduling with deteriorating jobs on a single machine
    Peng Liu
    Lixin Tang
    Xiaoye Zhou
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 47 : 657 - 664
  • [2] Single Machine Two-Agent Scheduling with Deteriorating Jobs
    Wang, Zhenyou
    Wei, Cai-Min
    Wu, Yu-Bin
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2016, 33 (05)
  • [3] Two-agent single-machine scheduling with deteriorating jobs
    Yin, Yunqiang
    Cheng, T. C. E.
    Wan, Long
    Wu, Chin-Chia
    Liu, Jun
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 81 : 177 - 185
  • [4] Two-Agent Single Machine Scheduling with Deteriorating Jobs and Rejection
    Li, Dawei
    Li, Ganggang
    Cheng, Fangzheng
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [5] Two-agent scheduling with linear deteriorating jobs on a single machine
    Liu, Peng
    Tang, Lixin
    [J]. COMPUTING AND COMBINATORICS, PROCEEDINGS, 2008, 5092 : 642 - 650
  • [6] Two-Agent Single Machine Scheduling with Deteriorating Jobs and Rejection
    Li, Dawei
    Li, Ganggang
    Cheng, Fangzheng
    [J]. Mathematical Problems in Engineering, 2022, 2022
  • [7] A single-machine scheduling problem with two-agent and deteriorating jobs
    Lee, Wen-Chiung
    Wang, Wei-Jhe
    Shiau, Yau-Ren
    Wu, Chin-Chia
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (10) : 3098 - 3107
  • [8] A Note on Two-agent Single-machine Scheduling Problem with Deteriorating Jobs
    Liu, Peng
    Feng, Daguang
    Zhou, Xiaoye
    Tang, Qi
    [J]. 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 3832 - +
  • [9] Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine
    Tang, Lixin
    Zhao, Xiaoli
    Liu, Jiyin
    Leung, Joseph Y. -T.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 263 (02) : 401 - 411
  • [10] Two-agent scheduling with linear-deteriorating jobs and release dates on a single machine
    Zhao, Xiao-Li
    Tang, Li-Xin
    [J]. Zidonghua Xuebao/Acta Automatica Sinica, 2015, 41 (01): : 104 - 112