The Research on System Model of Construction Materials Management by Project

被引:0
|
作者
Yuan Dongliang [1 ]
Xu Delong [1 ]
Sai Yunxiu [2 ]
机构
[1] Xian Univ Arch & Tech, Coll Management, Xian, Peoples R China
[2] Xian Technol Univ, Coll Management, Xian, Peoples R China
关键词
construction; One Body Two Wings; management by Project; supply chain; process; System;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Resting on the building materials management by Project, this article focuses on the actual construction material purchasing pattern of current construction market and the analysis of the conditions to implement CSCM patterns. To promote the development of modern project management and improve the enterprise economic benefit, the "One Body Two Wings" materials procurement management system model and the functional analysis are presented in this paper, which starting from procurement process management of the construction materials, based on the system engineering theory, project management criteria and IT technical aids.
引用
收藏
页码:1667 / +
页数:2
相关论文
共 5 条
  • [1] KANG DG, SWEEPING MANAGEMENT, P138
  • [2] LOFTS N, 2005, EXECUTIVE GUIDE BUSI
  • [3] SUN W, 2008, THESIS TIANJIN U, P5
  • [4] WANG JY, 2004, MODERN SCI MANAGEMEN, V10, P118
  • [5] ZHANG CL, 2008, TERAHERTZ SENSING IM, P3