Post-installed reinforcing bars - Requirements for their reliable use

被引:4
|
作者
Fuchs, Werner [1 ]
Hofmann, Jan [1 ]
机构
[1] Univ Stuttgart, Inst Construct Mat, Pfaffenwaldring 4, D-70569 Stuttgart, Germany
来源
关键词
Post-installed reinforcing bar; Design; Qualification; Bond; Anchorage; Repair; Strengthening;
D O I
10.1016/j.dibe.2020.100040
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Post-installed steel reinforcing bar connections carried out with anchoring mortars sufficiently qualified to fulfill the requirements for safety, serviceability, and durability of concrete structures are capable of developing bond behavior equivalent to cast-in-place steel reinforcing bars. Therefore, their design can be performed according to reinforced concrete design provisions. Post-installed anchorage technology offers fast and convenient solution to introduce new reinforcement in an existing reinforced concrete (RC) structural system, and hence serves as effective method for strengthening and upgrade of existing structures. The behavior of post-installed reinforcement depends on the existing condition of the concrete member. This paper addresses the aspects related to base material, installation, environment, and load conditions in service. This paper also comments on the qualification of anchoring mortars and provides information on the design of post-installed reinforcing bars as reinforcement (RC design perspective) or as anchorage (adhesive anchor design perspective) in the light of corresponding provisions necessary to achieve the same safety level in service compared to connections with cast-in steel reinforcing bars.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Design of post-installed reinforcing bars as end anchorage or as bonded anchor
    Mahrenholtz, Christoph
    Eligehausen, Rolf
    Reinhardt, Hans-Wolf
    [J]. ENGINEERING STRUCTURES, 2015, 100 : 645 - 655
  • [2] A new test specimen to investigate the bond behavior of post-installed reinforcing bars
    Rex, Justus
    Sharma, Akanshu
    Hofmann, Jan
    [J]. STRUCTURAL CONCRETE, 2019, 20 (02) : 583 - 596
  • [3] Tensile Bond Strength of Post-Installed Epoxy-Coated Reinforcing Bars
    Mills, Connor
    Dymond, Benjamin Z.
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (02)
  • [4] Recommended Procedures for Development and Splicing of Post-Installed Bonded Reinforcing Bars in Concrete Structures
    Charney, Finley A.
    Pal, Kamalika
    Silva, John
    [J]. ACI STRUCTURAL JOURNAL, 2013, 110 (03) : 437 - 446
  • [5] Bond stresses in post-installed reinforcing bars derived via fiber optic sensors
    Croppi, Jose I.
    Ahrens, Mark Alexander
    Genesio, Giovacchino
    Piccinin, Roberto
    Casucci, Daniele
    Mark, Peter
    [J]. STRUCTURAL CONCRETE, 2024, 25 (03) : 1884 - 1899
  • [6] Post-installed reinforcing steel bar connections - Basics for their safe use?
    Fuchs, Werner
    Hofmann, Jan
    [J]. BETON- UND STAHLBETONBAU, 2020, 115 (07) : 523 - +
  • [7] Re-evaluation of existing tests on RC connections using post-installed reinforcing bars
    Mahadik, Vinay
    Sharma, Akanshu
    Hofmann, Jan
    [J]. ENGINEERING STRUCTURES, 2020, 209
  • [8] Behavior of Post-Installed Bonded Bars as Shear Reinforcement
    Fiset, Mathieu
    Villemure, Felix-Antoine
    Bastien, Josee
    Mitchell, Denis
    [J]. ACI STRUCTURAL JOURNAL, 2020, 117 (04) : 159 - 168
  • [9] Post-installed anchors in concrete strengthened by post-installed reinforcement under tensile load
    Siamakani, Seyed Yaser Mousavi
    Sahamitmongkol, Raktipong
    [J]. EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2022, 26 (13) : 6563 - 6582
  • [10] Qualification and Design of Cast-in-Place and Post-Installed Reinforcing Bar Anchorages
    Mahrenholtz, Christoph
    Eligehausen, Rolf
    Reinhardt, Hans-Wolf
    [J]. ACI STRUCTURAL JOURNAL, 2020, 117 (02) : 3 - 16