A low-carbon game-based job scheduling considering material transit

被引:0
|
作者
Tian, Changle [1 ]
Zhou, Guanghui [1 ,2 ]
Chang, Fengtian [1 ]
Zhang, Junjie [1 ]
Wang, Chuang [3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Mech Engn, Xian 710049, Shaanxi, Peoples R China
[2] Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, Xian 710049, Shaanxi, Peoples R China
[3] Xian Univ Posts & Telecommun, Inst Internet Things & IT Based Industrializat, Xian, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
carbon emissions; multi-objective optimization; job scheduling; material transit;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
this paper proposes a low-carbon game-based job scheduling considering material transit. In the proposed method: (1)The players refer to job scheduling and material transit respectively; The strategy of each player refers to the selectable machines about submitted jobs; The payoffs of job scheduling refer to completed time and carbon emissions; The payoffs of material transit refer to transit cost and transit carbon emissions. (2)To solve the model, this paper introduces the concept of Nash-Pareto and the solving of the presented model is transferred to find the Nash-Pareto Equilibrium points in the solving space. (3)To get the Nash-Pareto Equilibrium points of this game, a NSGA-II algorithm is consequently developed to effectively solve the mathematical model. Finally, case study is designed to demonstrate the feasibility of the approach, and comparison result proves that the proposed method can balance the interests of job scheduling and material transit.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Trilateral Game-Based Research on Low-Carbon Logistics Development Mode
    Gao, Feng-hua
    Gao, Rui-hua
    [J]. 19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 1103 - 1110
  • [2] Infinitely repeated game based real-time scheduling for low-carbon flexible job shop considering multi-time periods
    Wang, Jin
    Yang, Jiahao
    Zhang, Yingfeng
    Ren, Shan
    Liu, Yang
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 247
  • [3] Optimizing the Low-Carbon Flexible Job Shop Scheduling Problem Considering Energy Consumption
    Jiang, Tianhua
    Deng, Guanlong
    [J]. IEEE ACCESS, 2018, 6 : 46346 - 46355
  • [4] Low-carbon scheduling model of multi-virtual power plants based on cooperative game considering failure risks
    Wu, Chen
    Wei, Zhinong
    Cao, Yang
    Xu, Yiteng
    Wei, Tiantian
    Han, Haiteng
    Chen, Sheng
    Zang, Haixiang
    [J]. IET RENEWABLE POWER GENERATION, 2024,
  • [5] Low-carbon scheduling and estimating for a flexible job shop based on carbon footprint and carbon efficiency of multi-job processing
    Zhang, Chaoyang
    Gu, Peihua
    Jiang, Pingyu
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 (02) : 328 - 342
  • [6] Low-Carbon Flexible Job Shop Scheduling Problem Based on Deep Reinforcement Learning
    Tang, Yimin
    Shen, Lihong
    Han, Shuguang
    [J]. SUSTAINABILITY, 2024, 16 (11)
  • [7] Low-carbon Optimal Dispatching of Integrated Energy System Considering Low-carbon Demand Response and Stackelberg Game
    Ye, Yujing
    Xing, Haijun
    Mi, Yang
    Yan, Zhan
    Dong, Jing
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2024, 48 (09): : 34 - 43
  • [8] A differential game approach to the low-carbon chains considering the role of shareholding
    Wang, Song
    Zhu, Dongliang
    Liu, Chang
    Li, Yaru
    [J]. ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024,
  • [9] Job shop scheduling considering material handling
    Smith, JS
    Peters, BA
    Srinivasan, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (07) : 1541 - 1560
  • [10] Low-carbon Scheduling of Integrated Energy System in Iron & Steel Industrial Park Considering Low-carbon Techniques and Process Control
    Gan, Lei
    Yang, Tianyu
    Chen, Xingying
    Shen, Jun
    Wang, Bo
    Yu, Kun
    [J]. Dianwang Jishu/Power System Technology, 2023, 47 (08): : 3099 - 3110