共 50 条
- [5] A MULTIAGENT SYSTEM FOR JOB-SHOP SCHEDULING [J]. ICEIS 2008 : PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL SAIC: SOFTWARE AGENTS AND INTERNET COMPUTING, 2008, : 148 - 153
- [7] Practical JOB-SHOP production scheduling algorithm [J]. Shanghai Ligong Daxue Xuebao/Journal of University of Shanghai for Science and Technology, 2002, 24 (04):
- [8] Job-shop production scheduling with reverse flows [J]. 2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 829 - 834
- [10] A PROTOTYPE RULE-BASED SYSTEM TO SCHEDULE PRODUCTION FOR A JOB-SHOP [J]. MICROPROCESSING AND MICROPROGRAMMING, 1991, 31 (1-5): : 19 - 24