Investigation of pipeline buckle failure in a horizontally directionally drilled installation

被引:0
|
作者
ODonnell, HW [1 ]
机构
[1] ODONNELL ASSOCIATES INC,SUGAR LAND,TX 77487
来源
PIPELINE CROSSINGS 1996: PROCEEDINGS OF THE SPECIALTY CONFERENCE | 1996年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:163 / 172
页数:10
相关论文
共 48 条
  • [1] DIRECTIONALLY-CONTROLLED HORIZONTALLY-DRILLED CROSSINGS
    不详
    WATER SERVICES, 1982, 86 (1033): : 113 - 113
  • [2] Novel Use of Horizontally Directionally Drilled (HDD) Drainage Technology for Landslide Remediation
    Morrison, Scott
    Paffard, Andrew
    Doepel, Luke
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION GEOTECHNICS, VOL 2, ICTG 2024, 2025, 403 : 227 - 235
  • [3] Dynamic model of pipeline during pulling in directionally drilled hole
    Tikhonov, Vadim S.
    Safronov, Alexander I.
    Gelfgat, Mikhail Ya.
    Figarov, Narnic G.
    Proceedings of the 24th International Conference on Offshore Mechanics and Arctic Engineering, Vol 3, 2005, : 395 - 401
  • [4] PIPELINE INSTALLATION USING DIRECTIONALLY CONTROLLED DRILLING.
    Hair, John D.
    Shiers, Geoffrey E.
    Public Works, 1987, 118 (06): : 73 - 75
  • [5] Investigation of premature failure of a well fluid pipeline in an Indian offshore installation
    Samant, AK
    Sharma, VK
    Thomas, S
    Anto, PF
    Singh, SK
    ADVANCES IN CORROSION CONTROL AND MATERIALS IN OIL AND GAS PRODUCTION, 1999, (26): : 180 - 187
  • [6] BP Amoco Chemicals - World's longest directionally drilled pipeline project presents challenges
    Council, TL
    Cox, M
    PIPELINE & GAS JOURNAL, 2000, 227 (05) : 22 - 26
  • [7] The Horizontal Directionally Drilled Installation of Dual Parallel 3,220-Foot Fusible PVC Pipelines
    Triebel, George
    Atkinson, Janet
    Darting, Gayleen
    Ramirez, Jose
    Hutcheson, Scott
    PIPELINES 2018: CONDITION ASSESSMENT, CONSTRUCTION, AND REHABILITATION, 2018, : 481 - 489
  • [8] Failure investigation of a drilled shaft stabilised slope
    Liao, Jen-Cheng
    Lin, San-Shyan
    Yang, Sheng-Der
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-FORENSIC ENGINEERING, 2013, 166 (01) : 17 - 26
  • [9] To know or not to know: The site characterization process and its' role in horizontal directionally drilled pipeline river crossings
    Hair, CW
    PIPELINE CROSSINGS 1996: PROCEEDINGS OF THE SPECIALTY CONFERENCE, 1996, : 56 - 68
  • [10] Case history: Horizontal directionally drilled pipeline crossing of the Red River at Shreveport Bossier City, Louisiana
    Hair, CW
    TRENCHLESS PIPELINE PROJECTS: PRACTICAL APPLICATIONS, 1997, : 448 - 457