共 3 条
Electricity generation from enhanced geothermal systems by oilfield produced water circulating through reservoir stimulated by staged fracturing technology for horizontal wells: A case study in Xujiaweizi area in Daqing Oilfield, China
被引:86
|作者:
Zhang, Yan-Jun
[1
,2
]
Li, Zheng-Wei
[1
]
Guo, Liang-Liang
[1
]
Gao, Ping
[1
]
Jin, Xian-Peng
[3
]
Xu, Tian-Fu
[2
]
机构:
[1] Jilin Univ, Coll Construct Engn, Changchun 130026, Peoples R China
[2] Jilin Univ, Minist Educ, Key Lab Groundwater Resource & Environm, Changchun 130026, Peoples R China
[3] Downhole Operat Co Daqing Oilfield, Daqing 163453, Peoples R China
来源:
基金:
国家高技术研究发展计划(863计划);
高等学校博士学科点专项科研基金;
关键词:
Enhanced geothermal system;
Reservoir stimulation;
Numerical simulation;
Electricity generation;
Staged fracturing technology;
HOT DRY ROCK;
NUMERICAL-SIMULATION;
WORKING FLUID;
ENERGY;
EFFICIENCY;
D O I:
10.1016/j.energy.2014.10.073
中图分类号:
O414.1 [热力学];
学科分类号:
摘要:
In this paper, the feasibility of generating electricity from EGS (enhanced geothermal systems) by oilfield produced water circulating through reservoir stimulated by staged fracturing technology for horizontal wells is investigated based on the geological data of Xujiaweizi area, located in the Daqing Oilfield, northeast China. HDR (hot dry rock) resource potential assessment is carried out by using volumetric method. Reservoir stimulation is numerically simulated based on the geological data of well YS-1 and field fracturing experience in this region. Geometric dimensions and flow conductivity of the resulting fracture are imported into the hydro-thermal model to calculate the electricity generation potential of the proposed EGS power plant. An EGS design scheme is proposed based on the simulation results. The system is also evaluated from the economic and environmental aspects. The results indicate that HDR resource in Xujiaweizi area is of great potential for development. Through the staged fracturing technology for horizontal wells, electricity generation power of the proposed EGS project can roughly meet the commercial standard. For 20 years of continuous production, power generation from the proposed EGS power plant is economic feasible. Meanwhile, significant reductions in greenhouse gas emissions can be achieved. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:788 / 805
页数:18
相关论文