共 50 条
- [1] Economic lot-sizing games [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) : 1117 - 1130
- [2] AN INTEGRATED UTILISATION, SCHEDULING AND LOT-SIZING ALGORITHM FOR PULL PRODUCTION [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2012, 19 (03): : 171 - 180
- [4] Economic lot-sizing with remanufacturing options [J]. Golany, B. (golany@ie.technion.ac.il), 2001, Kluwer Academic Publishers (33):
- [5] Economic lot-sizing with remanufacturing options [J]. IIE TRANSACTIONS, 2001, 33 (11) : 995 - 1003
- [6] Optimal production policy for economic production lot-sizing model with preventive maintenance [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2021, 18 (01): : 83 - 100
- [10] Economic production and remanufacturing lot-sizing under constant demands and returns [J]. OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 328 - 332