Planning and scheduling teams of skilled workers

被引:15
|
作者
Perron, Laurent [1 ]
机构
[1] Google France, F-75002 Paris, France
关键词
Audit scheduling; Constraint programming; Planning; Scheduling; Operation research; DECISION SUPPORT SYSTEM; AUDIT;
D O I
10.1007/s10845-008-0164-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Solving problems that mix planning and scheduling are often seen as a challenge. Discrete time-based scheduling, along with complex side constraints, does not mix well with the more flexible nature of the planning model. This is demonstrated in our experiments when trying to solve a problem where we must assemble teams of skilled workers to perform jobs that require these skills, break up these teams and then assemble new ones to perform more jobs. The mixing of the planning part (grouping workers into teams) and the scheduling part (creating a schedule for each worker), along with some difficult side constraints and a large problem size (800 workers, 2,000 jobs over one month) combine to contribute to the challenge of finding good solutions for this problem.
引用
收藏
页码:155 / 164
页数:10
相关论文
共 50 条
  • [1] Planning and scheduling teams of skilled workers
    Laurent Perron
    [J]. Journal of Intelligent Manufacturing, 2010, 21 : 155 - 164
  • [2] A master scheduling model with skilled and unskilled temporary workers
    Techawiboonwong, Atthawit
    Yenradee, Pisal
    Das, Sanchoy K.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) : 798 - 809
  • [3] Dual-objective Job Shop Scheduling Problem with Skilled Workers
    Sem, C.
    Sirovetnukul, R.
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 1203 - 1207
  • [4] Interday routing and scheduling of multi-skilled teams with consistency consideration and intraday rescheduling
    Anoshkina, Yulia
    Meisel, Frank
    [J]. EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2020, 9 (03)
  • [5] Career Changers and Assistants in multi-professional Teams - Is it a possible Solution for the Shortage of Skilled Workers?
    Spindler, Anna
    [J]. FRUHE BILDUNG, 2021, 10 (01): : 49 - 52
  • [6] Skilled workers shortage
    Duckworth, KR
    [J]. INTECH, 1998, 45 (12) : 14 - 14
  • [7] Scheduling part-time and mixed-skilled workers to maximize employee satisfaction
    Akbari, Mohammad
    Zandieh, M.
    Dorri, Behrouz
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 1017 - 1027
  • [8] Automatic Generation of a Detailed Outfitting Planning and Determining the Effect of Multi-Skilled Mounting Teams
    Rose, Christopher
    Coenen, Jenny
    [J]. ADVANCES IN MANUFACTURING TECHNOLOGY XXX, 2016, 3 : 181 - 186
  • [9] Scheduling part-time and mixed-skilled workers to maximize employee satisfaction
    Mohammad Akbari
    M. Zandieh
    Behrouz Dorri
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 64 : 1017 - 1027
  • [10] Training of Skilled Workers
    不详
    [J]. INTERNATIONAL LABOUR REVIEW, 1937, 35 (06) : 880 - 880