The Value of Long-Term Streamflow Forecasts in Adaptive Reservoir Operation: The Case of the High Aswan Dam in the Transboundary Nile River Basin

被引:15
|
作者
Eldardiry, Hisham [1 ]
Hossain, Faisal [1 ]
机构
[1] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
关键词
Rivers; Forecast verification; skill; Operational forecasting; Seasonal forecasting; Hydrologic models; Optimization; BLUE-NILE; WATER-RESOURCES; MODEL; SYSTEMS; RULES; LEAD; PREDICTABILITY; UNCERTAINTY; PREDICTION; RAINFALL;
D O I
10.1175/JHM-D-20-0241.1
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
Transboundary river basins are experiencing extensive dam development that challenges future water management, especially for downstream nations. Thus, adapting the operation of existing reservoirs is indispensable to cope with alterations in flow regime. We proposed a Forecast-Based Adaptive Reservoir Operation (FARO) framework to evaluate the use of long-term climate forecasts in improving real-time reservoir operations. The FARO approach was applied to the High Aswan Dam (HAD) in the Nile River basin. Monthly precipitation and temperature forecasts at up to 12 months of lead time are used from a suite of eight North American Multi-Model Ensemble (NMME) models. The value of NMME-based forecasts to reservoir operations was compared with perfect and climatology-based forecasts over an optimization horizon of 10 years from 1993 to 2002. Our results indicated that the forecast horizon for HAD operation ranges between 5 and 12 months lead time at low- and high-demand scenarios, respectively, beyond which the forecast information no longer improves the release decision. The forecast value to HAD operation is more pronounced in the months following the flooding season (October-December). During these months, the skill of streamflow forecasts using NMME forcings outperforms the climatology-based forecasts. When considering the operation of upstream Grand Ethiopian Renaissance Dam (GERD), using streamflow forecasts minimally helps to maintain current target objectives of HAD operation and therefore result in higher operation costs as opposed to current conditions without GERD. Our study underlined the importance of deriving a new adaptive operating policy for HAD to improve the value of available forecasts while considering GERD filling and operation phases. SIGNIFICANCE STATEMENT Water management in the Nile River basin is challenged by the construction of the Grand Ethiopian Renaissance Dam (GERD) in Ethiopia. Thus, it becomes important to adapt the operation of existing dams to expected alteration in upstream flow. This study aims to use long-term forecasts to improve real-time operations of the High Aswan Dam (HAD) in Egypt. Forecasting streamflow up to 8 months ahead showed a significant improvement in the HAD operation. However, when considering GERD, using forecasts could minimally help to maintain current objectives of HAD operation. Our findings underline the importance of deriving a new operating policy for HAD to improve the value of available forecasts while considering future upstream projects.
引用
收藏
页码:1099 / 1115
页数:17
相关论文
共 50 条
  • [1] Basis for Extending Long-Term Streamflow Forecasts in the Colorado River Basin
    Lamb, Kenneth W.
    Piechota, Thomas C.
    Aziz, Oubeidillah A.
    Tootle, Glenn A.
    [J]. JOURNAL OF HYDROLOGIC ENGINEERING, 2011, 16 (12) : 1000 - 1008
  • [2] Developing an Optimized Policy Tree-Based Reservoir Operation Model for High Aswan Dam Reservoir, Nile River
    Goharian, Erfan
    Shaltout, Mohamed
    Erfani, Mahdi
    Eladawy, Ahmed
    [J]. WATER, 2022, 14 (07)
  • [3] Reservoir operation impacts on streamflow and sediment dynamics in the transboundary river basin, Vietnam
    Bui, Thao T. P.
    Kantoush, Samehahmed
    Kawamura, Akira
    Du, Tien L. T.
    Bui, Nuong Thi
    Capell, Rene
    Nguyen, Ngoc T.
    Du Bui, Duong
    Saber, Mohamed
    Tetsuya, Sumi
    Lee, Hyongki
    Saleh, Ali
    Lakshmi, Venkataraman
    Bartosova, Alena
    Doan Van Binh
    Nguyen, Binh Quang
    Nguyen, Tra T. T.
    [J]. HYDROLOGICAL PROCESSES, 2023, 37 (09)
  • [4] Value of long-term streamflow forecasts to reservoir operations for water supply in snow-dominated river catchments
    Anghileri, D.
    Voisin, N.
    Castelletti, A.
    Pianosi, F.
    Nijssen, B.
    Lettenmaier, D. P.
    [J]. WATER RESOURCES RESEARCH, 2016, 52 (06) : 4209 - 4225
  • [5] Use of Seasonal Streamflow Forecasts for Flood Mitigation with Adaptive Reservoir Operation: A Case Study of the Chao Phraya River Basin, Thailand, in 2011
    Kompor, Wongnarin
    Yoshikawa, Sayaka
    Kanae, Shinjiro
    [J]. WATER, 2020, 12 (11) : 1 - 19
  • [6] Long-Term Stochastic Modeling of Monthly Streamflow in River Nile
    Abdelaziz, Shokry
    Ahmed, Ahmed Mohamed Mahmoud
    Eltahan, Abdelhamid Mohamed
    Abd Elhamid, Ahmed Medhat Ismail
    [J]. SUSTAINABILITY, 2023, 15 (03)
  • [7] Long-term potential impact of Great Ethiopian Renaissance Dam (GERD) on the downstream eastern Nile High Aswan Dam (HAD)
    Ephrem, Kidus Abebe
    [J]. SUSTAINABLE WATER RESOURCES MANAGEMENT, 2019, 5 (04) : 1973 - 1980
  • [8] Long-term potential impact of Great Ethiopian Renaissance Dam (GERD) on the downstream eastern Nile High Aswan Dam (HAD)
    Abebe Ephrem Kidus
    [J]. Sustainable Water Resources Management, 2019, 5 : 1973 - 1980
  • [9] Incorporating Mid-Term Temperature Predictions into Streamflow Forecasts and Operational Reservoir Projections in the Colorado River Basin
    Towler, Erin
    Woodson, David
    Baker, Sarah
    Ge, Ming
    Prairie, James
    Rajagopalan, Balaji
    Shanahan, Seth
    Smith, Rebecca
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2022, 148 (04)
  • [10] Long-term persistence and multifractality of streamflow dynamics in the Godavari River Basin, India
    Sunkara, Sri Lakshmi
    [J]. JOURNAL OF INDIAN GEOPHYSICAL UNION, 2022, 26 (05): : 374 - 384