A single activity with a practice quality improvement project for faculty and a quality improvement project for residents

被引:2
|
作者
Kim, Hyun [1 ]
Malatesta, Theresa M. [1 ]
Simone, Nicole L. [1 ]
Den, Robert B. [1 ]
McAna, John [2 ]
Dicker, Adam P. [1 ]
Bar Ad, Voichita [1 ]
机构
[1] Thomas Jefferson Univ, Sidney Kimmel Med Coll, Dept Radiat Oncol, 111 South 11th St, Philadelphia, PA 19107 USA
[2] Thomas Jefferson Univ, Jefferson Coll Populat Hlth, Philadelphia, PA 19107 USA
关键词
PATIENT HANDOFFS; CARE;
D O I
10.1016/j.prro.2015.10.014
中图分类号
R73 [肿瘤学];
学科分类号
100214 ;
摘要
Purpose: The Next Accreditation System (NAS) requires radiation oncology residents to do a formal quality improvement project during their residency. The American Board of Radiology (ABR) Maintenance of Certification (MOC) program requires certified physicians to complete a Practice Quality Improvement (PQI) project approximately every 3 years. The purpose of our project was to develop a clinical transition of care policy via a process that resulted in quality improvement project credit for residents and PQI credit for participating faculty. Methods and materials: Approval for project implementation was obtained from the ABR MOC committee. The PQI project consisted of an initial survey to assess resident perception on resident transition of care in our department, formal sign-out training, and 2 postintervention surveys after 1 and 11 months. The primary endpoint was the percentage of questions with <= 1 unfavorable responses. Sign-test was used to determine response difference from neutral. Results: One hundred percent of surveyed residents completed the preintervention (n = 6), postintervention 1 (n = 7), and postintervention 2 (n = 8) surveys. In the preintervention, postintervention 1, and postintervention 2 surveys, 71.4%, 57.1%, and 57.1% of questions were answered with <= 1 unfavorable response, respectively. The number of questions with >= 75% favorable response was 7 (50%), 7 (50%), and 11 (78.5%) in the preintervention, postintervention 1, and postintervention 2 surveys, respectively (P =.13). A written sign-out template and monthly protected sign-out meetings were instituted. One resident and 3 attending physicians received credit for Accreditation Council of Graduate Medical Education NAS quality improvement and ABR MOC PQI projects, respectively. Conclusions: This project shows the feasibility of a combined attending and resident physician effort to improve patient care and fulfill his or her respective ABR MOC PQI and Accreditation Council of Graduate Medical Education NAS requirements. Attending and resident physicians can tailor collaborative projects to fulfill MOC and NAS requirements unique to their subspecialty. Written sign-out templates and protected sign-out time may improve transition of care. (C) 2016 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
引用
收藏
页码:114 / 118
页数:5
相关论文
共 50 条
  • [1] Quality Improvement Project: for Improvement
    Hansen, Nora M.
    Scherer, Sally Anne
    Khan, Seema
    [J]. JOURNAL OF THE NATIONAL COMPREHENSIVE CANCER NETWORK, 2014, 12 : S10 - S12
  • [2] A Quality Improvement Project
    Joy, Julija A.
    Gunn, Jennie
    Mulekar, Madhuri S.
    [J]. JOURNAL OF ADDICTIONS NURSING, 2023, 34 (03) : E79 - E83
  • [3] A Quality Improvement Project
    Ralls, F.
    Qaseem, S.
    So, J.
    Hemphill, D.
    Bhatti, K.
    Parker, G.
    [J]. JOURNAL OF THE AMERICAN GERIATRICS SOCIETY, 2009, 57 : S178 - S178
  • [4] Approaching the Practice Quality Improvement Project in Interventional Radiology
    Reis, Stephen P.
    White, Benjamin
    Sutphin, Patrick D.
    Pillai, Anil K.
    Kalva, Sanjeeva P.
    Toomay, Seth M.
    [J]. JOURNAL OF THE AMERICAN COLLEGE OF RADIOLOGY, 2015, 12 (12) : 1337 - 1344
  • [5] Project Sleep: A Multidisciplinary Quality Improvement Project
    Brodt, Z. N.
    Grabscheid, E.
    Tapper, C.
    Perry, H.
    Gallagher, M.
    Chang, W.
    Loewy, J.
    Lucido, D.
    Fogel, J.
    [J]. JOURNAL OF THE AMERICAN GERIATRICS SOCIETY, 2016, 64 : S143 - S143
  • [6] Chronicle of a quality improvement project
    Pyzdek, T.
    Maciulla, J.A.
    [J]. Quality Engineering, 1994, 7 (03)
  • [7] What is a quality improvement project?
    Gill, Deborah
    Mountford, James
    [J]. BRITISH JOURNAL OF HOSPITAL MEDICINE, 2012, 73 (05) : 252 - 256
  • [8] Identifying a quality improvement project
    Katakam, Lakshmi
    Suresh, Gautham K.
    [J]. JOURNAL OF PERINATOLOGY, 2017, 37 (10) : 1161 - 1165
  • [9] Bronchiectasis Quality Improvement Project
    Gray, Alice
    Gimson, Peter
    Thiraviyarajah, Mathuramina
    Mal, Maria
    Davies, Harvey
    Wang, Yifei
    Thein, Shaun
    Saggu, Manpreet Kaur
    Coulter-Brophy, Sarah
    Rauf, Farrukh
    [J]. EUROPEAN RESPIRATORY JOURNAL, 2018, 52
  • [10] Debriefing in the OR: A Quality Improvement Project
    Finch, Elizabeth P.
    Langston, Michael
    Erickson, Deborah
    Pereira, Katherine
    [J]. AORN JOURNAL, 2019, 109 (03) : 336 - 344