Assembly line balancing for personalized production

被引:3
|
作者
Pilati, Francesco [1 ]
Lelli, Giovanni [2 ]
Faccio, Maurizio [3 ]
Gamberi, Mauro [2 ]
Regattieri, Alberto [2 ]
机构
[1] Univ Trento, Dept Ind Engn, Via Sommar 9, I-38123 Trento, Italy
[2] Univ Bologna, Dept Ind Engn, Viale Risorgimento 2, I-40136 Bologna, Italy
[3] Univ Padua, Dept Management & Engn, San Nicola 3, I-36100 Vicenza, Italy
来源
IFAC PAPERSONLINE | 2020年 / 53卷 / 02期
关键词
assembly line balancing; personalized production; product optional; customization; clustering; customer order; MODEL;
D O I
10.1016/j.ifacol.2020.12.2758
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly line balancing problems aim to an efficient and effective assignment of all the required tasks to workstations in a flow oriented production system. Nowadays, assembly lines have to face the manufacturing of extremely personalized products (e.g. cars) as requested by an increasingly higher portion of the market demand. Several literature contributions focus on different balancing problems affected by the wide variety of the final product, e.g. mixed and multi model assembly lines. However, no contribution seems to tackle the personalized production of goods. Such products require to assemble a certain number of tasks whatever the final product personalization is, and a variable number of optional of different type determined by the specifications of every single costumer. This paper faces the generalized assembly of personalized goods proposing an innovative two step methodology to optimize the workload balancing between the assembly line stations, considering traditional tasks and the optional required by the product personalization, which could occur with different frequencies and pairings. The first phase of the developed methodology executes a clustering of product options required by the costumers based on a similarity index. This phase leads to the definition of several sets of optional typically requested together by the customer and with similar mounting time. The methodology second phase leverages the defined clusters of optional. Indeed, optional of the same cluster shouldn't be assigned to the same workstation to reduce the overload or underload of the assembly operators. An integer programming model is proposed to assign both traditional tasks and optional to stations, to maximize the assembly line balancing considering the order frequency and assembly time of the clusterized optional. An industrial case study is adopted to test and validate the proposed two steps methodology. The obtained results highlight a consistent time balancing between assembly line workstations and a significant limitation of the operator overloads. Copyright (C) 2020 The Authors.
引用
收藏
页码:10261 / 10266
页数:6
相关论文
共 50 条
  • [1] The Balancing Control of Garments Production Assembly Line
    Lv, Ya-Chi
    Liang, Su-Zhen
    [J]. TEXTILE BIOENGINEERING AND INFORMATICS SYMPOSIUM (TBIS) PROCEEDINGS, 2018, 2018, : 668 - 672
  • [2] Assembly Process Reengineering Applied To Production Line Balancing
    Ma Li-xin
    Xie Hai-hong
    Zhang Jian-bo
    Ma Li-xin
    Xie Hai-hong
    Zhang Jian-bo
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 95 - 98
  • [3] ON ASSEMBLY LINE BALANCING
    KLEIN, M
    [J]. OPERATIONS RESEARCH, 1963, 11 (02) : 274 - 281
  • [4] ASSEMBLY LINE BALANCING BY USING STATISTICAL METHOD IN CLOTHING PRODUCTION
    Eryuruk, Selin Hanife
    Baskak, Murat
    Kalaoglu, Fatma
    [J]. TEKSTIL VE KONFEKSIYON, 2011, 21 (01): : 65 - 71
  • [5] Linear Programming Algorithm for Assembly Line Balancing in Crane Production
    Zhang, Si-Qi
    Ge, Qi
    Yang, Nan-Nan
    Zhang, Yu
    Zhu, Ying-Qiao
    Xing, Ying-Wen
    [J]. 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND MECHANICAL AUTOMATION (CSMA 2017), 2017, : 410 - 415
  • [6] ERGONOMIC ASSEMBLY LINE BALANCING
    Baykasoglu, Adil
    Demirkol Akyol, Sebnem
    [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2014, 29 (04): : 785 - 792
  • [7] A REVIEW OF ASSEMBLY LINE BALANCING
    IGNALL, EJ
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING, 1965, 16 (04): : 244 - &
  • [8] Ergonomic assembly line balancing
    Ergonomik Montaj Hatti dengeleme
    [J]. 1600, Gazi Universitesi (29):
  • [9] A METHOD FOR ASSEMBLY LINE BALANCING
    BETTS, J
    MAHMOUD, KI
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (01): : 55 - 64
  • [10] CUSTOMIZED ASSEMBLY LINE BALANCING
    MOODIE, CL
    [J]. INDUSTRIAL ENGINEERING, 1973, 5 (08): : 10 - 13