Improving Manufacturing Supply Chain by Integrating SMED and Production Scheduling

被引:1
|
作者
Parwani, Viren [1 ]
Hu, Guiping [1 ]
机构
[1] Iowa State Univ, Ind & Mfg Syst Engn IMSE, Ames, IA 50011 USA
来源
LOGISTICS-BASEL | 2021年 / 5卷 / 01期
关键词
changeover; single minute exchange die (smed); thermoforming; production scheduling; PROCESS IMPROVEMENT; 6; SIGMA; PROJECT; SYSTEM; TOOLS;
D O I
10.3390/logistics5010004
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Globalization has led to a significant effect on today's manufacturing sector. Manufacturers need to find new and innovative ways to increase efficiency and reduce waste in the manufacturing supply chain. Lean/six sigma tools can help companies increase production efficiency and stay in competition. Manufacturing in smaller batches can keep the supply chain lean and customizable. This leads to frequent changeovers and downtime. A changeover is usually required when a single machine produces different products based on the requirement. A large-scale industry can either install multiple individual production lines to cater to the demand (usually expensive) or make frequent machinery changes. Single Minute Exchange Die (SMED) is a system designed for reducing the changeover time for machines. It reduces the time taken to complete the activities and eliminates non-essential activities throughout the changeover. Scheduling an operating procedure within SMED in such case is a challenge. Project scheduling model with workforce constraints can be used to create a set of heuristics to provide us with an optimized list of tasks. The paper proposes to design a scheduling heuristic model to allocate tasks to the operators to get the least amount of operator idle time and reduce changeover downtime costs. The paper further illustrates the benefit of the model in a case study and proposes its integration within the existing SMED methodology. This results in a benefit-to-cost ratio of 7.5% for production scheduling compared to that of stages 4 and 5 in SMED, which is 1.2%.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [2] A simheuristic approach towards supply chain scheduling: Integrating production, maintenance and distribution
    Rabet, Rahmat
    Ganji, Maliheh
    Fathi, Masood
    [J]. APPLIED SOFT COMPUTING, 2024, 153
  • [3] Integrating production and transport scheduling for Supply Chain Management under market uncertainty
    Guillén, G
    Bonfill, A
    Espuña, A
    Puigjaner, L
    [J]. EUROPEAN SYMPOSIUM ON COMPUTER-AIDED PROCESS ENGINEERING - 14, 2004, 18 : 919 - 924
  • [4] Production scheduling in agent-based supply chain for manufacturing efficiency improvement
    Plinere, Darya
    Aleksejeva, Ludmila
    [J]. ICTE IN TRANSPORTATION AND LOGISTICS 2018 (ICTE 2018), 2019, 149 : 36 - 43
  • [5] Scheduling optimisation for supply chain in networked manufacturing
    Li, Chuan
    Wang, Shi-Long
    Zhang, Xian-Ming
    Gu, Hong
    Kang, Ling
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2011, 40 (1-2) : 85 - 90
  • [6] Advanced planning and scheduling with outsourcing in manufacturing supply chain
    Lee, YH
    Jeong, CS
    Moon, C
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) : 351 - 374
  • [7] Study on supply chain optimization scheduling of networked manufacturing
    Gu Hong
    Li Chuan
    Lu Zhang
    Zhang Xianming
    [J]. PROCEEDINGS OF THE 6TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED COMPUTER SCIENCE, 2007, : 219 - +
  • [8] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Zegordi, Seyed Hessameddin
    Nia, Mohammad Ali Beheshti
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 928 - 939
  • [9] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [10] Manufacturing Chain and it's production scheduling problem
    Wang, Yanhong
    Wu, Xin
    Yu, Yang
    Li, Weimin
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION, VOLS 1-7, 2007, : 2023 - +