Lean readiness factors for construction organizations

被引:0
|
作者
Prasad, Kudrekodlu Venkatesh [1 ,2 ]
Venkatesan, Vasugi [1 ]
机构
[1] Vellore Inst Technol, Sch Civil Engn, Chennai 600127, Tamil Nadu, India
[2] Natl Inst Construct Management & Res, Sch Construct Management, Hyderabad 500101, Telangana, India
关键词
Lean Construction; Lean readiness; Readiness factors; Lean transformation; Culture; CRITICAL SUCCESS FACTORS; 6 SIGMA IMPLEMENTATION; INSTITUTIONS; PERFORMANCE; FRAMEWORK;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Application of the principles of the "Toyota Production Systems" and the advancements such as lean management systems for the construction projects are very beneficial. Implementation of lean systems in any organization is a journey of transformation that requires an intrinsic recognition of the need and commitment towards improvement, driven with passion by the top management, changes to existing organizational cultures and practices before it can be implemented. Studies have been documented that more than 90% of the organizations fail in their journey of lean implementation and a majority of the organizations have failed to sustain the implementation and reap the benefits thereon. Research has been conducted in SMEs and manufacturing, healthcare & emergency, humanitarian & higher education domains to identify a set of conditions/practices which indicate the state of readiness of organizations to embrace the lean journey. Currently, no studies exist which have investigated the aspect of lean readiness of construction organizations. The present study has identified the lean readiness factors for construction organizations covering all the phases of construction projects, through literature review and experts' opinions. The factors identified form the basis for the design of the framework which shall benefit construction organizations immensely for sustainable lean transformation.
引用
收藏
页码:608 / 619
页数:12
相关论文
共 50 条
  • [1] Readiness Factors for Sustainable Lean Transformation of Construction Organizations
    Prasad, Kudrekodlu V.
    Vasugi, Venkatesan
    [J]. SUSTAINABILITY, 2023, 15 (08)
  • [2] Modelling of readiness factors for the implementation of Lean Six Sigma in healthcare organizations
    Vaishnavi, V.
    Suresh, M.
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2020, 11 (04) : 597 - 633
  • [3] Lean readiness of organizations - A systematic scientometric review
    Prasad, K. V.
    Vasugi, V.
    Antony, Jiju
    Garza-Reyes, Jose Arturo
    Venkatesan, R.
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2023, 34 (15-16) : 2124 - 2156
  • [4] Readiness for lean procurement in construction projects
    Suresh, M.
    Arun Ram Nathan, R. B.
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (04): : 587 - 608
  • [5] Lean readiness assessment model - a tool for Humanitarian Organizations' social and economic sustainability
    Shafiq, Muhammad
    Soratana, Kullapa
    [J]. JOURNAL OF HUMANITARIAN LOGISTICS AND SUPPLY CHAIN MANAGEMENT, 2020, 10 (02) : 77 - 99
  • [6] Identifying Elements for Lean Construction Implementation in Trade Contractor Organizations
    Khan, M. A. Hamza
    Asadian, Elnaz
    Leicht, Robert M.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 496 - 506
  • [7] Readiness factors for lean implementation in healthcare settings - a literature review
    Al-Balushi, S.
    Sohal, A. S.
    Singh, P. J.
    Al Hajri, A.
    Al Farsi, Y. M.
    Al Abri, R.
    [J]. JOURNAL OF HEALTH ORGANIZATION AND MANAGEMENT, 2014, 28 (02) : 135 - 153
  • [8] Factors Effective for Implementation of Lean in Manufacturing Organizations of India
    Bagal, Suhas
    Dasgupta, Hirak
    [J]. CARDIOMETRY, 2022, (24): : 510 - 516
  • [9] Conceptual framework for lean construction ambidexterity in project-based organizations
    Fang, Yanqing
    Daniel, Emmanuel Itodo
    Li, Shuquan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (10) : 824 - 838
  • [10] Readiness factors for the Lean Six Sigma journey in the higher education sector
    Antony, Jiju
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2014, 63 (02) : 257 - +