Subjective Performance Assessment of Innovation Projects

被引:68
|
作者
Blindenbach-Driessen, Floortje [1 ]
van Dalen, Jan [2 ]
van den Ende, Jan [2 ]
机构
[1] George Washington Univ, Sch Business, Washington, DC 20052 USA
[2] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
关键词
PRODUCT DEVELOPMENT SUCCESS; CONSTRUCTION; CAPABILITIES; INDICATORS; INDUSTRIAL; IMPACT; NPD;
D O I
10.1111/j.1540-5885.2010.00736.x
中图分类号
F [经济];
学科分类号
02 ;
摘要
Performance assessment of innovation projects is a central issue in innovation management research. Using existing literature, a model is developed to assess the performance of new product and new service development projects. In this model, project performance is defined as a combination of a formatively indicated operational performance construct and a reflectively indicated product performance construct. The validity of this model is tested based on a sample of 219 innovation projects assessed by innovation managers. Using only the innovation managers' responses, it is, however, not possible to distinguish between operational and product performance. The impact of common method bias and informant bias is subsequently assessed using a subsample of 128 of these 219 innovation projects that are assessed by the innovation manager and the project leader. These latter results show that operational and product performance are two distinct constructs. In addition, the multitrait-multimethod analyses show that especially the more abstract items of performance, such as the perceptions of quality, captured knowledge, competitive advantage, gained reputation, and customer satisfaction, suffer from random error and informant bias. Project leaders appear to be better informed to assess operational performance, while innovation managers are better in assessing product performance. The paper concludes with a qualitative comparison of several alternative performance models: the project performance model as derived from the literature, a similar (misspecified) reflective performance model, two stand-alone models in which operational and product performance are assessed separately, and a mixed model that uses a combination of innovation managers' and project managers' data. Based on this comparison, it is advised to use either the stand-alone models for operational performance and product performance or the mixed model whereby the project leader assesses operational performance and the innovation manager the product performance of an innovation project.
引用
收藏
页码:572 / 592
页数:21
相关论文
共 50 条
  • [1] Subjective risk assessment for planning conservation projects
    Game, Edward T.
    Fitzsimons, James A.
    Lipsett-Moore, Geoff
    McDonald-Madden, Eve
    [J]. ENVIRONMENTAL RESEARCH LETTERS, 2013, 8 (04):
  • [2] Assessment of the advancement of market-upstream innovations and of the performance of research and innovation projects
    Klessova, Svetlana
    Engell, Sebastian
    Thomas, Catherine
    [J]. TECHNOVATION, 2022, 116
  • [3] INNOVATION STIMULANTS, INNOVATION CAPACITY, AND THE PERFORMANCE OF CAPITAL PROJECTS
    Chen, Hong Long
    [J]. JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2014, 15 (02) : 212 - 231
  • [4] Assessment of the efficiency of innovation projects in the energy sector
    Ershova, Natalia
    Shangaraev, Ruslan
    Kostyshak, Mikhail
    Safonova, Natalia
    Sukhova, Valentina
    Popkova, Elena
    Tinkova, Elena
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
  • [5] Quality assessment of university teaching innovation projects
    Lopez Lopez, Ma Carmen
    Hinojosa Pareja, Eva F.
    Sanchez Morillo, Ma Dolores
    [J]. PROFESORADO-REVISTA DE CURRICULUM Y FORMACION DE PROFESORADO, 2014, 18 (03): : 377 - 391
  • [6] Guanxi, performance and innovation in entrepreneurial service projects
    Arribas, Ivan
    Hernandez, Penelope
    Vila, Jose E.
    [J]. MANAGEMENT DECISION, 2013, 51 (1-2) : 173 - 183
  • [7] The assessment of risk in technological innovation projects and an analysis of examples
    Xie, KF
    Wu, ZY
    Zhou, JH
    [J]. 98 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, PROCEEDINGS, 1998, : 654 - 657
  • [8] Projects as communicating systems: Creating a culture of innovation and performance
    Johannessen, Jon-Arild
    Olsen, Bjorn
    [J]. INTERNATIONAL JOURNAL OF INFORMATION MANAGEMENT, 2011, 31 (01) : 30 - 37
  • [9] Can innovation network projects result in efficient performance?
    Arranz, Nieves
    Carlos Fdez de Arroyabe, J.
    [J]. TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2012, 79 (03) : 485 - 497
  • [10] The effect of Six Sigma projects on innovation and firm performance
    Parast, Mahour Mellat
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (01) : 45 - 55