Using Atlassian Tools for Efficient Requirements Management An industrial case study

被引:0
|
作者
Filion, Luc [1 ]
Daviot, Nicolas [1 ]
Le Bel, Jean-Philippe [2 ]
Gagnon, Marc [2 ]
机构
[1] Nuum Solut, 304-4529 Clark St, Montreal, PQ H2T 2T3, Canada
[2] ISC Appl Syst, 290 Ave Labrosse, Pointe Claire, PQ H9R 6R6, Canada
关键词
requirements management; traceability; JIRA; Atlassian; CMMI;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper describes an industrial case study using Atlassian JIRA (R) and third party plugins for requirements management in the field of transit systems. The solution presented shows efficiency in supporting the management of requirements, traceability and the systems engineering processes globally. After a short description of the technologies in action and a brief overview of the process we targeted, we describe the collection of methods and technologies put into place and demonstrate their use in order to achieve our goal: reaching CMMI-2 for requirements management and traceability. We describe the current background and scope of work, the needs and goals to meet, and then we explain our configurations and possibilities. Our results describe several sets of metrics we have obtained for traceability, starting from a customer requirement down to tests, considering multi-level analysis with specific criteria (verified, tested and justified).
引用
下载
收藏
页码:446 / 451
页数:6
相关论文
共 50 条
  • [1] Using WinWin quality requirements management tools: A case study
    In, H
    Boehm, BW
    ANNALS OF SOFTWARE ENGINEERING, 2001, 11 : 141 - 174
  • [2] Meeting industrial strategic requirements with the use of knowledge management tools
    Purnama, Eka Desy
    Nguyen, PhongThanh
    ThuyTo Nguyen, Quyen Le Hoang
    Huynh, Vy Dang Bich
    Wekke, Ismail Suardi
    Test Engineering and Management, 2019, 81 : 1131 - 1135
  • [3] Requirements for requirements management tools
    Hoffmann, M
    Kühn, N
    Weber, M
    Bittner, M
    12TH IEEE INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE, PROCEEDINGS, 2004, : 301 - 308
  • [4] Monitoring requirements coverage using reconstructed views: An industrial case study
    Lormans, Marco
    Gross, Hans-Gerhard
    van Deursen, Arie
    van Solingen, Rini
    Stehouwer, Andre
    13TH WORKING CONFERENCE ON REVERSE ENGINEERING PROCEEDINGS, 2006, : 275 - 284
  • [5] Requirements management - a case study
    Lal, J
    COMPUTERS IN RAILWAYS VIII, 2002, 13 : 875 - 886
  • [6] An industrial case study on requirements volatility measures
    Loconsole, A
    Börstler, R
    12TH ASIA-PACIFIC SOFTWARE ENGINEERING CONFERENCE, PROCEEDINGS, 2005, : 249 - 256
  • [7] An industrial case study in reconstructing requirements views
    Marco Lormans
    Arie van Deursen
    Hans-Gerhard Gross
    Empirical Software Engineering, 2008, 13 : 727 - 760
  • [8] An industrial case study in reconstructing requirements views
    Lormans, Marco
    van Deursen, Arie
    Gross, Hans-Gerhard
    EMPIRICAL SOFTWARE ENGINEERING, 2008, 13 (06) : 727 - 760
  • [9] An Industrial Case Study on Test Cases as Requirements
    Bjarnason, Elizabeth
    Unterkalmsteiner, Michael
    Engstrom, Emelie
    Borg, Markus
    AGILE PROCESSES, IN SOFTWARE ENGINEERING, AND EXTREME PROGRAMMING, XP 2015, 2015, 212 : 27 - 39
  • [10] Case Study: Efficient Algorithms for Air Traffic Management Decision Support Tools
    John, Sabrina
    John, Kai Lothar
    2015 WORKSHOP ON SENSOR DATA FUSION - TRENDS, SOLUTIONS, APPLICATIONS (SDF), 2015,