Investigation on performance of a large circular pit-in-pit excavation in clay-gravel-cobble mixed strata

被引:66
|
作者
Tan, Yong [1 ]
Lu, Ye [2 ]
Xu, Changjie [3 ,4 ]
Wang, Dalong [5 ]
机构
[1] Tongji Univ, Dept Geotech Engn, Coll Civil Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China
[2] Shanghai Univ, Dept Civil Engn, 99 Shang Da Rd, Shanghai 200444, Peoples R China
[3] East China Jiaotong Univ, Sch Civil Engn, 808 Shuanggang East Ave, Nanchang 330013, Jiangxi, Peoples R China
[4] East China Jiaotong Univ, Architecture Dept, 808 Shuanggang East Ave, Nanchang 330013, Jiangxi, Peoples R China
[5] Shanghai Geotech Invest & Design Inst Co Ltd, 681 Xiao Mu Qiao Rd, Shanghai 200032, Peoples R China
基金
上海市自然科学基金; 中国国家自然科学基金;
关键词
Pit-in-pit excavation; Displacement; Earth pressure; Clay-rock mixtures; Bedrock; Circular diaphragm wall; Continuous bored pile wall; Instrumentation; Numerical analyses; MULTI-PROPPED EXCAVATION; TOP-DOWN EXCAVATION; SHANGHAI SOFT CLAY; GROUND DEFORMATIONS; DEEP EXCAVATIONS; RETAINING WALL; BEHAVIOR; MOVEMENTS; DEPOSITS; DATABASE;
D O I
10.1016/j.tust.2018.06.023
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A unique pit-in-pit (PIP) excavation, which comprised a large diameter circular pit outside and a smaller deeper rectangular pit inside, was constructed in clay-gravel-cobble mixed strata. To guarantee project safety as well as characterize behavior of PIP excavation, investigate influence of inner pit excavation on outer pit performance and explore lateral earth pressure mobilized in discrete geomaterials, this project was extensively instrumented throughout construction. Field data indicated that it performed distinctly from those excavations in literature. This excavation caused relatively smaller wall and ground displacements, both of which featured distinctive profiles; current empirical and semi-empirical approaches for predicting excavation performance were not applicable to this case any more. To control performance of PIP excavation, it is of paramount importance to limit lateral wall movement of inner pit. Contrary to previous recognition, basal rebound due to excavation took place not only in soft clay, but also in stiff to hard clay, clay-gravel-cobble mixtures, and even decomposed bedrock. Different from those in fine grained soils, magnitudes of lateral earth pressures against retaining wall in clay-gravel-cobble mixtures showed a wide range of scattering and their thrusts were transferred to wall mainly via contact force of rock particles. Classic Rankine theory substantially underestimated while current empirical apparent earth pressure (AEP) diagrams highly overestimated magnitude of lateral active earth pressure of clay-gravel-cobble mixtures. For design of PIP excavation, the ground between inner and outer retaining walls should be treated as the passive state during excavation of outer pit, while as the active state during subsequent excavation of inner pit when greater increment of deflection occurred to inner wall than outer wall. Casting head of inner wall inside base slab of outer pit prior to excavation of inner pit was a cost-effective solution for enhancing excavation performance; socketing wall toe into underlying decomposed bedrock significantly mitigated potential risk associated with wall kicking.
引用
收藏
页码:356 / 374
页数:19
相关论文
共 12 条
  • [1] Investigation into the Performance of a Covered Top-Down Pit-in-Pit Deep Excavation in Shenzhen Soil-Rock Mixed Strata
    Yang Chen
    Pengjiao Jia
    Xinbo Ji
    Arabian Journal for Science and Engineering, 2021, 46 : 10419 - 10437
  • [2] Investigation into the Performance of a Covered Top-Down Pit-in-Pit Deep Excavation in Shenzhen Soil-Rock Mixed Strata
    Chen, Yang
    Jia, Pengjiao
    Ji, Xinbo
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2021, 46 (11) : 10419 - 10437
  • [3] Lateral bearing performance and mechanism of piles in the transition zone due to pit-in-pit excavation
    Liyuan Tong
    Hongjiang Li
    Si Ha
    Songyu Liu
    Acta Geotechnica, 2022, 17 : 1935 - 1948
  • [4] Lateral bearing performance and mechanism of piles in the transition zone due to pit-in-pit excavation
    Tong, Liyuan
    Li, Hongjiang
    Ha, Si
    Liu, Songyu
    ACTA GEOTECHNICA, 2022, 17 (05) : 1935 - 1948
  • [5] Performance of an asymmetric pit-in-pit excavation supported by diaphragm wall and multi uplift piles system in coastal areas
    Wang, Ruisong
    Dong, Hongyuan
    Shen, Daoxu
    Li, Jianfeng
    Ni, Pengpeng
    Zhao, Chenyang
    CANADIAN GEOTECHNICAL JOURNAL, 2024, 61 (08) : 1666 - 1682
  • [6] Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
    Cao, Wenxin
    Jia, Pengjiao
    Ni, Pengpeng
    Zhao, Wen
    Cheng, Cheng
    Wang, Fei
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2024, 18 (11) : 1680 - 1697
  • [7] Analytical investigation of tunnel deformation caused by circular foundation pit excavation
    Sun, Huasheng
    Chen, Yadong
    Zhang, Jihua
    Kuang, Tiesheng
    COMPUTERS AND GEOTECHNICS, 2019, 106 : 193 - 198
  • [8] The use of Passive Integrated Transponder (PIT) tags to trace cobble transport in a mixed sand-and-gravel beach on the high-energy Oregon coast, USA
    Allan, Jonathan C.
    Hart, Roger
    Tranquili, J. Vincent
    MARINE GEOLOGY, 2006, 232 (1-2) : 63 - 86
  • [9] Deformation Characteristics and Optimization Design for Large-Scale Deep and Circular Foundation Pit Partitioned Excavation in a Complex Environment
    Shi, Hai
    Jia, Zhilei
    Wang, Tao
    Cheng, Zhiqiang
    Zhang, De
    Bai, Mingzhou
    Yu, Kun
    BUILDINGS, 2022, 12 (09)
  • [10] Investigation of the Axial Force Compensation and Deformation Control Effect of Servo Steel Struts in a Deep Foundation Pit Excavation in Soft Clay
    Di, Honggui
    Guo, Huiji
    Zhou, Shunhua
    Chen, Jinming
    Wen, Lu
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019