Determination of the Parameters for the Evaluation of the Current Development and Use of New Temporary Railway Bridge Structure in the Czech

被引:0
|
作者
Sousek, R. [1 ]
Viskup, P. [1 ]
Hruza, P. [2 ]
机构
[1] Univ Pardubice, Studentska 95, Pardubice 53210, Czech Republic
[2] Univ Def, Brno 66210, Czech Republic
来源
关键词
crisis management; transport safety; railway transport; temporary bridges;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
This article deals with Determination of the parameters for the evaluation of the current development and use of new temporary railway bridge structure in the Czech Republic [1]. Determination of the parameters must be based on specific circumstances, on the railway network of the Czech Republic and on the marginal situation [3]; whose probability is minimum usage is not necessary to the construction of the design.
引用
收藏
页码:35 / 37
页数:3
相关论文
共 50 条
  • [1] The Development and Application of Evaluation System to the New Temporary Railway Bridge Construction in the Czech Republic
    Sousek, R.
    Viskup, P.
    Hruza, P.
    TRANSPORT MEANS 2014, 2014, : 329 - 334
  • [2] Draft of the New Temporary Railway Bridge in the Czech Republic
    Dybal, J.
    Englich, J.
    Sousek, R.
    Sustr, M.
    TRANSPORT MEANS 2015, PTS I AND II, 2015, : 712 - 716
  • [3] Extension of the New Temporary Railway Bridge in the Czech Republic, Draft of the Reinforcement
    Dybal, J.
    Englich, J.
    Sousek, R.
    Sustr, M.
    PROCEEDINGS OF THE 20TH INTERNATIONAL SCIENTIFIC CONFERENCE TRANSPORT MEANS 2016, 2016, : 1051 - 1057
  • [4] A composite dowel bridge in the Czech Republic Development, optimization and implementation of a railway bridge
    Simon, Pavel
    Hrdlicka, Libor
    Drab, Ales
    Zverina, Vojtech
    STEEL CONSTRUCTION-DESIGN AND RESEARCH, 2016, 9 (03): : 191 - 199
  • [5] Evaluation of dynamic effects and fatigue assessment of a railway bridge supported by temporary monitoring
    Marques, F.
    Hu, W. -H.
    Moutinho, C.
    Magalhaes, F.
    Cunha, A.
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1230 - 1237
  • [6] Experimental determination of hypoplastic parameters and cyclic numerical analysis for railway bridge backfills
    Stastny, A.
    Knittel, L.
    Meier, T.
    Tschuchnigg, F.
    ACTA GEOTECHNICA, 2024, 19 (10) : 6899 - 6916
  • [7] The new development of alternating current railway engines
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1937, 81 : 1250 - 1251
  • [8] BRIDGE OVER THE MASARYK RAILWAY STATION - LONG TERM MONITORING OF BEHAVIOUR OF THE LARGEST BRIDGE STRUCTURE IN THE CZECH REPUBLIC OF RECENT DAYS
    Vokac, Miroslav
    Kolisko, Jiri
    Klimes, Petr
    Matousova, Lucie
    Safar, Roman
    Sterba, Karel
    FIB SYMPOSIUM PRAGUE 2011: CONCRETE ENGINEERING FOR EXCELLENCE AND EFFICIENCY, VOLS 1 AND 2, 2011, : 447 - 450
  • [9] EFFECTIVE USE OF TEMPORARY GROUPS FOR NEW PRODUCT DEVELOPMENT
    ELLIS, LW
    RESEARCH MANAGEMENT, 1979, 22 (01): : 31 - 34
  • [10] Determination of rational parameters for the advanced structure of a pedestrian suspension steel bridge
    Juozapaitis, Algirdas
    Norkus, Arnoldas
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2007, 2 (04): : 173 - 181