The Risk Analysis of Construction Project Based on Fuzzy Analytic Hierarchy Process

被引:0
|
作者
Jia, Xianzhao [1 ]
Kang, Zhenqiang [1 ]
He, Dongyan [2 ]
机构
[1] Henan Univ Sci & Technol, 48 Xiyuan Rd, Luoyang City, Henan Province, Peoples R China
[2] Hubei Gold BMW Environm Protect Sci & Technol Co, Huanggang City, Hubei Province, Peoples R China
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper sets up the fuzzy comprehensive evaluation model for the risk analysis of the feasibility study stage based on the theory of fuzzy analytic hierarchy process and proceed on risk analysis and assessment of the feasibility study stage about the proposed project, which enhances the credibility of risk assessment process during the feasibility study stage. It improves the risk analysis and evaluation process of the feasibility study.(1)
引用
收藏
页码:6 / 10
页数:5
相关论文
共 50 条
  • [1] Occupational safety risk analysis in construction sites based on fuzzy analytic hierarchy process: A case study in a large construction project
    Soltanzadeh, Ahmad
    Mahdinia, Mohsen
    Jafarinia, Ehsan
    Golmohammadpour, Hamedeh
    Sadeghi-Yarandi, Mohsen
    [J]. WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2023, 76 (02): : 771 - 782
  • [2] Study of the Risk Based on Construction logistics by Fuzzy Analytic Hierarchy Process
    Zhang Jianwei
    Zhu Minjie
    Zhang Liwei
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 399 - +
  • [3] Evaluation Research of the Thermal Power Engineering Project Construction Risk Based on Fuzzy Analytic Hierarchy Process
    Zhao, Jian-Na
    Liu, Fei-Fan
    [J]. INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING AND MECHANICAL AUTOMATION (ICEEMA 2015), 2015, : 375 - 379
  • [4] Risk analysis in construction sites using fuzzy reasoning and fuzzy analytic hierarchy process
    Majumder, Debasish
    Debnath, Joy
    Biswas, Animesh
    [J]. FIRST INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE: MODELING TECHNIQUES AND APPLICATIONS (CIMTA) 2013, 2013, 10 : 604 - 614
  • [5] Investment Risk Analysis of Gas and Pipeline Construction Project Based on the Gray Analytic Hierarchy Process
    Mu, Lin-lin
    Bi, Xing
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 467 - 471
  • [6] Study on Software Project Risk Assessment based on Fuzzy Analytic Hierarchy Process
    Meng, Yu-qiao
    [J]. 2017 IEEE 3RD INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC), 2017, : 853 - 857
  • [7] Construction engineering project quality evaluation method based on fuzzy analytic hierarchy process
    Shao, Hui
    Fu, Haijian
    [J]. 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 228 - 231
  • [8] Analytic hierarchy process based on fuzzy analysis
    Entani, T
    Sugihara, K
    Tanaka, H
    [J]. Computational Intelligence, Theory and Applications, 2005, : 301 - 309
  • [9] Analysis of landslide risk based on fuzzy extension analytic hierarchy process
    Yang, Weifeng
    Zheng, Zhihong
    Zhang, Xinquan
    Tan, Baohua
    Li, Luyao
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 33 (04) : 2523 - 2531
  • [10] Analysis of university construction project management models based on analytic hierarchy process
    Yang, Haiyong
    Wang, Xiaoxiao
    Zhang, Juan
    Ren, Ying
    Long, Fenjie
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2013, 53 (08): : 1119 - 1127