High-cycle fatigue of diagonally cracked RC bridge girders: Laboratory tests

被引:7
|
作者
Higgins, Christopher [1 ]
Lee, Ae-Young
Potisuk, Tanarat
Forrest, Richard W. B.
机构
[1] Oregon State Univ, Dept Civil Engn, Corvallis, OR 97331 USA
[2] HW Lochner Inc, Salem, OR 97303 USA
[3] CH2M Hill Inc, Corvallis, OR 97330 USA
关键词
concrete; reinforced; bridges; shear; laboratory tests; fatigue; cracking;
D O I
10.1061/(ASCE)1084-0702(2007)12:2(226)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large numbers of conventionally RC deck-girder bridges are in the national highway system. Diagonal cracks have been identified in many of these bridges, which are exposed to millions of load cycles during service life. The anticipated life of these bridges in the cracked condition under repeated service loads is uncertain. Laboratory experiments were performed on full-size girder specimens to evaluate possible deterioration in shear capacity under repeated loading. Specimen variables included: T and inverted-T configurations, stirrup spacing, and flexural reinforcing details. Test results indicated bond deterioration increased diagonal crack displacements, and analysis methods to predict the shear capacity of diagonally cracked reinforced concrete girders subjected to high-cycle fatigue damage are provided. The AASHTO-LRFD shear provisions conservatively predicted shear capacity for the fatigued specimens without stirrup fractures, and shear capacity predictions from computer analysis program Response 2000 were very well correlated with experimental results for fatigued test specimens when the input concrete tensile strength was reduced to nearly zero.
引用
收藏
页码:226 / 236
页数:11
相关论文
共 50 条
  • [1] High-cycle fatigue of diagonally cracked reinforced concrete bridge girders: Field tests
    Higgins, Christopher
    Farrow, William C., III
    Nicholas, Brian S.
    Potisuk, Tanarat
    JOURNAL OF BRIDGE ENGINEERING, 2006, 11 (06) : 699 - 706
  • [2] Fatigue of diagonally cracked RC girders repaired with CFRP
    Williams, Grahme
    Higgins, Christopher
    JOURNAL OF BRIDGE ENGINEERING, 2008, 13 (01) : 24 - 33
  • [3] High-cycle fatigue tests of pretensioned concrete beams
    Remitz, Joern
    Empelmann, Martin
    PCI JOURNAL, 2022, 67 (01): : 63 - 76
  • [4] Experimental investigation of high-cycle fatigue behavior for prestressed concrete box-girders
    Yuan, Ming
    Yan, Donghuang
    Zhong, Hao
    Liu, Yongming
    CONSTRUCTION AND BUILDING MATERIALS, 2017, 157 : 424 - 437
  • [5] A high-cycle fatigue apparatus at 20 kHz for low-cycle fatigue/high-cycle fatigue interaction testing
    Matikas, TE
    FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, 2001, 24 (10) : 687 - 697
  • [6] Conducting high-cycle fatigue strength step tests on gamma TiAl
    Lerch, BA
    Draper, SL
    Pereira, JM
    METALLURGICAL AND MATERIALS TRANSACTIONS A-PHYSICAL METALLURGY AND MATERIALS SCIENCE, 2002, 33 (12): : 3871 - 3874
  • [7] Conducting high-cycle fatigue strength step tests on gamma TiAl
    B. A. Lerch
    S. L. Draper
    J. M. Pereira
    Metallurgical and Materials Transactions A, 2002, 33 : 3871 - 3874
  • [8] Effects of pre-fatigue damage on high-cycle fatigue behavior and chloride permeability of RC beams
    Wu, Jieqiong
    Zhang, Runxiao
    Diao, Bo
    Zhang, Wuman
    Xu, Jianchao
    INTERNATIONAL JOURNAL OF FATIGUE, 2019, 122 : 9 - 18
  • [9] Hydrogen as an indicator of high-cycle fatigue
    Belyaev, Alexander K.
    Polyanskiy, Vladimir A.
    Yakovlev, Yuri A.
    DYNAMICAL ANALYSIS OF MULTIBODY SYSTEMS WITH DESIGN UNCERTAINTIES, 2015, 13 : 138 - 143
  • [10] Infrared temperature mapping of ULTIMET alloy during high-cycle fatigue tests
    Wang, H
    Jiang, L
    Liaw, PK
    Brooks, CR
    Klarstrom, DL
    METALLURGICAL AND MATERIALS TRANSACTIONS A-PHYSICAL METALLURGY AND MATERIALS SCIENCE, 2000, 31 (04): : 1307 - 1310