Control in Internal and Outsourced Software Projects

被引:117
|
作者
Tiwana, Amrit [1 ]
Keil, Mark [2 ]
机构
[1] Iowa State Univ, Coll Business, Ames, IA 50011 USA
[2] Georgia State Univ, J Mack Robinson Coll Business, Atlanta, GA 30303 USA
关键词
attempted control; control theory; information systems development; project controls; realized control; survey research; ORGANIZATIONAL CONTROL; USER PARTICIPATION; MANAGEMENT; INFORMATION; PERSPECTIVE; PERFORMANCE; DESIGN; RISK; UNCERTAINTY; COOPERATION;
D O I
10.2753/MIS0742-1222260301
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Although the choice of control mechanisms in systems development projects has been extensively studied in prior research, differences in such choices across internal and outsourced projects and their effects on systems development performance have not received much attention. This study attempts to address this gap using data on 57 outsourced and 79 internal projects in 136 organizations. Our results reveal a paradoxical overarching pattern: controllers attempt greater use of control mechanisms in outsourced projects relative to internal projects, yet controls enhance systems development performance in internal projects but not in outsourced projects. We introduce a distinction between attempted control and realized control to explain this disconnect, and show how anticipated transaction hazards motivate the former but meeting specific informational and social prerequisites facilitate the latter. Our results contribute three new insights to the systems development control literature. First, controllers attempt to use controller-driven control mechanisms to a greater degree in outsourced projects but controllee-driven control mechanisms to a greater degree in internal projects. Second, we establish a hitherto-missing control-performance link. The nuanced differences in internal and outsourced projects simultaneously confirm and refute a pervasive assertion in the information systems controls literature that control enhances performance. Finally, we show how requirements volatility-which can be at odds with control-alters the control-performance relationships. Implications for theory and practice are also discussed.
引用
收藏
页码:9 / 44
页数:36
相关论文
共 50 条
  • [1] Portfolios of control in outsourced software development projects
    Choudhury, V
    Sabherwal, R
    [J]. INFORMATION SYSTEMS RESEARCH, 2003, 14 (03) : 291 - 314
  • [2] Effective Monitoring and Control of Outsourced Software Development Projects
    Ponisio, Laura
    Vruggink, Peter
    [J]. INFORMATION SYSTEMS DEVELOPMENT: ASIAN EXPERIENCES, 2011, : 135 - 147
  • [3] Metrics-based control in outsourced software development projects
    Ponisio, L.
    van Eck, P.
    [J]. IET SOFTWARE, 2012, 6 (05) : 438 - 450
  • [4] Improving Management of Outsourced Software Projects in Pakistan
    Jalil, Zunera
    Hanif, Aamer
    [J]. 2009 2ND IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 3, 2009, : 519 - 523
  • [5] Modified Agile Practices for Outsourced Software Projects
    Batra, Dinesh
    [J]. COMMUNICATIONS OF THE ACM, 2009, 52 (09) : 143 - 148
  • [6] Boundary Objects and Internal Control in Outsourced ISO Projects: Results of a Pilot Study
    Gantman, Sonia
    [J]. AMCIS 2011 PROCEEDINGS, 2011,
  • [7] Drivers of Customer Satisfaction in Outsourced Software Development Projects
    Helbling, Thomas
    [J]. PROCEEDINGS OF EASE 2019 - EVALUATION AND ASSESSMENT IN SOFTWARE ENGINEERING, 2019, : 354 - 355
  • [8] Evidence-Based Management of Outsourced Software Projects
    Sudaman, Fadrian
    Mingins, Christine
    [J]. SOFTWARE ENGINEERING APPROACHES FOR OFFSHORE AND OUTSOURCED DEVELOPMENT, 2009, 16 : 149 - 165
  • [9] Managing Outsourced Software Projects: An Analysis of Project Performance and Customer Satisfaction
    Narayanan, Sriram
    Balasubramanian, Sridhar
    Swaminathan, Jayashankar M.
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2011, 20 (04) : 508 - 521
  • [10] Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects
    Govindaraju, Rajesri
    Bramagara, Angra
    Gondodiwiryo, Leksananto
    Simatupang, Tota
    [J]. JOURNAL OF ICT RESEARCH AND APPLICATIONS, 2015, 9 (01) : 68 - 87