Commissioning of Alusaf Hillside Smelter reduction pots

被引:0
|
作者
Aussel, JP [1 ]
Frison, JC [1 ]
Kroutz, S [1 ]
Stander, G [1 ]
机构
[1] Aluminium Pechiney Licensing Dept, FR-38340 Voreppe, France
来源
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
From 18 June 1995 to 21 June 1996, Alusaf Hillside Smelter started the 576 AP30 reduction pots of its two potlines. The promising results achieved by the first stabilized pots allowed the Process management team to finely tune the potlines around 310 kA and to achieve current efficiency in excess of 95.5% and energy consumption very close to 13000kWh/t during the first half of 1996. The results of these first months of operation of the first full potline are discussed in this paper. It includes data on the raw materials, the organization and the training programs of the Reduction Department which were all instrumental in engineering this success. The evolution of the Reduction Process parameters and results described in the paper will be updated for the final presentation with the available data of both potlines.
引用
收藏
页码:227 / 231
页数:3
相关论文
共 50 条
  • [1] ALUSAF ALUMINUM SMELTER AT RICHARDS BAY
    KAISER, HT
    DEWAAL, P
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1977, 77 (12): : 247 - 253
  • [2] COMMISSIONING THE AFTON COPPER SMELTER
    NICKEL, WPT
    SIEWERT, P
    THORNTON, GW
    [J]. JOURNAL OF METALS, 1979, 31 (12): : 118 - 118
  • [3] COMMISSIONING OF THE OLYMPIC DAM SMELTER
    DAY, BE
    [J]. NON-FERROUS SMELTING SYMPOSIUM: 100 YEARS OF LEAD SMELTING AND REFINING IN PORT PIRIE, 1989, : 57 - 60
  • [4] COMMISSIONING OF EMIRATES ALUMINIUM SMELTER POTLINES
    Kakkar, B. K.
    Spencer, David S.
    Al-Sayed, Walid
    Abdulla, Salman
    [J]. LIGHT METALS 2012, 2012, : 721 - 726
  • [5] Commissioning the Port Kembla Copper smelter
    West, RC
    Fahey, NP
    Maxwell, TR
    Hay, SM
    [J]. SULFIDE SMELTING 2002, 2002, : 167 - 179
  • [6] Retrofit of Soderberg Smelter at Alusaf Bayside plant .1. Conceptual design and engineering
    Vogelsang, D
    Droste, C
    Segatz, M
    Eick, I
    [J]. LIGHT METALS 1996, 1996, : 327 - 333
  • [7] Retrofit of Soderberg Smelter at Alusaf Bayside plant .2. Startup and operation of pilot plant
    Ferreira, JA
    [J]. LIGHT METALS 1996, 1996, : 335 - 338
  • [8] Commissioning of the Ausmelt lead smelter at Hindustan Zinc
    McClelland, Ross
    Hoang, Joey
    Lightfoot, Brian
    Dhanavel, D.
    [J]. SOHN INTERNATIONAL SYMPOSIUM ADVANCED PROCESSING OF METALS AND MATERIALS, VOL 8: INTERNATIONAL SYMPOSIUM ON SULFIDE SMELTING 2006, 2006, : 163 - +
  • [9] COMMISSIONING OF A SECOND COBALT RECOVERY FURNACE AT NCHANGA SMELTER
    Masanza, Musompa K.
    Cheeba, Raymond M.
    Ng'andwe, Kamata
    Mines, Konkola Copper
    [J]. 5TH INTERNATIONAL SYMPOSIUM ON HIGH-TEMPERATURE METALLURGICAL PROCESSING, 2014, : 217 - 223
  • [10] ACID AND OXYGEN PLANT COMMISSIONING AT THE OLYMPIC DAM COPPER SMELTER
    SHELLEY, RI
    COLLINS, DN
    [J]. NON-FERROUS SMELTING SYMPOSIUM: 100 YEARS OF LEAD SMELTING AND REFINING IN PORT PIRIE, 1989, : 197 - 203