Multi-period investment pathways - Modeling approaches to design distributed energy systems under uncertainty

被引:15
|
作者
Bohlayer, Markus [1 ,2 ]
Buerger, Adrian [1 ,3 ]
Fleschutz, Markus [1 ,4 ]
Braun, Marco [1 ]
Zoettl, Gregor [2 ,5 ]
机构
[1] Karlsruhe Univ Appl Sci, Inst Refrigerat Air Conditioning & Environm Engn, Moltkestr 30, D-76133 Karlsruhe, Germany
[2] Friedrich Alexander Univ Erlangen Nurnberg, Econ Ind Org & Energy Markets, Lange Gasse 20, D-90403 Nurnberg, Germany
[3] Univ Freiburg, Dept Microsyst Engn IMTEK, Syst Control & Optimizat Lab, Georges Koehler Allee 102, D-79110 Freiburg, Germany
[4] Cork Inst Technol, Dept Proc Energy & Transport Engn, Rossa Ave, Bishopstown T12 P928, Cork, Ireland
[5] Energie Campus Nurnberg,Further Str 250, D-90429 Nurnberg, Germany
关键词
Distributed energy systems; Mixed-integer optimization; Uncertainty; Multi-period investment; Economic planning; Multi-modal energy systems; OPTIMIZATION;
D O I
10.1016/j.apenergy.2020.116368
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Multi-modal distributed energy system planning is applied in the context of smart grids, industrial energy supply, and in the building energy sector. In real-world applications, these systems are commonly characterized by existing system structures of different age where monitoring and investment are conducted in a closed-loop, with the iterative possibility to invest. The literature contains two main approaches to approximate this computationally intensive multi-period investment problem. The first approach simplifies the temporal decision-making process collapsing the multi-stage decision to a two-stage decision, considering uncertainty in the second stage decision variables. The second approach considers multi-period investments under the assumption of perfect foresight. In this work, we propose a multi-stage stochastic optimization model that captures multi-period investment decisions under uncertainty and solves the problem to global optimality, serving as a first-best benchmark to the problem. To evaluate the performance of conventional approaches applied in a multi-year setup, we propose a rolling horizon heuristic that on the one hand reveals the performance of conventional approaches applied in a multi-period set-up and on the other hand enables planners to identify approximate solutions to the original multi-stage stochastic problem. We conduct a real-world case study and investigate solution quality as well as the computational performance of the proposed approaches. Our findings indicate that the approximation of multi-period investments by two-stage stochastic approaches yield the best results regarding constraint satisfaction, while deterministic multi-period approximations yield better economic and computational performance.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Multi-period investment pathways - Modeling approaches to design distributed energy systems under uncertainty
    Bohlayer, Markus
    Bürger, Adrian
    Fleschutz, Markus
    Braun, Marco
    Zöttl, Gregor
    [J]. Applied Energy, 2021, 285
  • [2] A MODEL OF MULTI-PERIOD INVESTMENT UNDER UNCERTAINTY
    NASLUND, B
    WHINSTON, A
    [J]. MANAGEMENT SCIENCE, 1962, 8 (02) : 184 - 200
  • [3] Multi-period transportation network design under demand uncertainty
    Ukkusuri, Satish V.
    Patil, Gopal
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2009, 43 (06) : 625 - 642
  • [4] Pricing Multi-period Dispatch Under Uncertainty
    Guo, Ye
    Tong, Lang
    [J]. 2018 56TH ANNUAL ALLERTON CONFERENCE ON COMMUNICATION, CONTROL, AND COMPUTING (ALLERTON), 2018, : 341 - 345
  • [5] MULTI-PERIOD CONTROL PROBLEM UNDER UNCERTAINTY
    PRESCOTT, EC
    [J]. ECONOMETRICA, 1972, 40 (06) : 1043 - 1058
  • [6] Jensen's Inequality, Parameter Uncertainty, and Multi-period Investment
    Grinblatt, Mark
    Linnainmaa, Juhani T.
    [J]. REVIEW OF ASSET PRICING STUDIES, 2011, 1 (01): : 1 - 34
  • [7] Multi-period supplier selection under price uncertainty
    Sen, Alper
    Yaman, Hande
    Gueler, Kemal
    Koerpeoglu, Evren
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (11) : 1636 - 1648
  • [8] Sustainable multi-period hub location under uncertainty
    Amir Khaleghi
    Alireza Eydi
    [J]. Soft Computing, 2023, 27 : 2009 - 2040
  • [9] MULTI-PERIOD CONSUMPTION DECISION UNDER CONDITIONS OF UNCERTAINTY
    LEVY, H
    [J]. MANAGEMENT SCIENCE, 1976, 22 (11) : 1258 - 1267
  • [10] Sustainable multi-period hub location under uncertainty
    Khaleghi, Amir
    Eydi, Alireza
    [J]. SOFT COMPUTING, 2023, 27 (04) : 2009 - 2040