The Ecological Control method of the Highway Construction - A Case Study

被引:1
|
作者
Huang Leichang [2 ,6 ]
Gu Xun [2 ]
Cao Fucun [2 ]
Ye Shuhong [3 ]
Wang Haiyan [4 ]
Song Shufan [4 ]
Huang Chunyan [1 ]
He Yunxin [5 ]
机构
[1] Weifang Landscape Bur Shandong Prov, Weifang, Peoples R China
[2] Dalian Polytec Univ, Art & Design Sch, Dalian, Peoples R China
[3] Dalian Polytec Univ, biol & Food Sch, Dalian, Peoples R China
[4] Dalian Hongyi Architectural Plan & Design Co Ltd, Dalian, Peoples R China
[5] Jiangnan Univ, Art & Design Sch, Wuxi, Jiangsu, Peoples R China
[6] Shanghai Inst Technol, Shanghai, Peoples R China
关键词
Ecological Control; Highway; Chong-Qi Highway; Chongming Island; GIS; ROAD;
D O I
10.1109/ESIAT.2009.91
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
With the fast development of Chinese economy, expressway, as the most important portion of the highway networks, had been developed at an astonishing fast speed, which brought on increasingly severe ecological environmental problems in the mean time such as soil and water loss, damage of vegetation ecosystem, geological environment and water environment etc. As a result, the ecological environmental control of highway construction presents great strategic sense in realizing the coordination between the highway construction and the social, economic, environmental benefit. Based on the electric-map of land use of Chongming Island in 1:10000 and aided by the software of ARC GIS9.1, This paper, took the Chong-Qi Highway crossing Chongming Island as an example, selected the main ecological factors of water, arm, mudflat, forest wood and building areas, and carried on the risk assessment of them by an eco-control model of ecological node. As a result, the key ecological nodes of this case were selected the corresponding methods were put forward according to the life cycle of the highway.
引用
收藏
页码:171 / +
页数:3
相关论文
共 50 条
  • [1] The ecological control of the highway construction for the environment-friendly ecosystem based on the GIS: a case study
    Huang, L. C.
    Huang, C. Y.
    Zhu, J.
    Fan, Z. Q.
    Wang, Y.
    Wang, X. R.
    [J]. 2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES: ITESS 2008, VOL 2, 2008, : 364 - 369
  • [2] Beautiful highway construction case study
    Chen, Youzhou
    Wang, Fa
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENTAL ENGINEERING, 2016, 53 : 26 - 30
  • [3] The Connotation and Model of Chinese Ecological Highway Construction
    Gao Xingwu
    Lin Zhen
    [J]. PROCEEDINGS OF 2009 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE & SYSTEM DYNAMICS, VOL 2, 2009, : 91 - 95
  • [4] Ecological view of sustainable development highway construction
    Chen, Hong
    Liang, Li-Jie
    Yang, Cai-Xia
    [J]. Chang'an Daxue Xuebao (Ziran Kexue Ban)/Journal of Chang'an University (Natural Science Edition), 2004, 24 (01):
  • [5] Model for sorting partners in construction: a case study in a highway project
    Silva, A. C. C. L. M.
    Alencar, L. H.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2019, : 1518 - 1523
  • [6] PCA Model and Case Study for Coastal Highway Construction Projects
    Gao, Wentian
    Song, Jiayi
    Guo, Wei
    [J]. JOURNAL OF COASTAL RESEARCH, 2019, : 191 - 195
  • [7] Case study in the construction of tunnels on the Durango Mazatlan highway (Mexico)
    Ramirez-Piedrabuena, A.
    Canete-Enriquez, L.
    Araujo-Quimbaya, W.
    [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2186 - 2193
  • [8] Control of construction projects using the Earned Value Method - case study
    Araszkiewicz, Krystyna
    Bochenek, Magdalena
    [J]. OPEN ENGINEERING, 2019, 9 (01): : 186 - 195
  • [9] Research on Internal Control of Highway Construction
    Cheng Xiao
    Huang Changjiang
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, 2011, : 832 - 836
  • [10] LINEAR SCHEDULING METHOD FOR HIGHWAY CONSTRUCTION
    JOHNSTON, DW
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1981, 107 (02): : 247 - 261