共 50 条
- [1] Optimizing concurrent configuration and planning: A proposition to reduce computation time [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1367 - 1371
- [4] Product and Process Configuration: A constraint based approach [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 2010 - +
- [6] Perception of Time in the Product Configuration Process: An Empirical Study [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2020, : 4340 - 4345
- [7] Systems engineering based approach for product and process concurrent design [J]. 11th European Concurrent Engineering Conference 2004: WORLDWIDE PARTNERSHIPS AND MERGERS, 2004, : 64 - 68
- [10] Representative Benchmark for Concurrent Product and Process Configuration Problem: Definitions and Some Problem Instances [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 301 - 306