Integrating MRP and finite capacity planning

被引:33
|
作者
Taal, M [1 ]
Wortmann, JC [1 ]
机构
[1] EINDHOVEN UNIV TECHNOL,FAC IND ENGN & MANAGEMENT SCI,NL-5600 MB EINDHOVEN,NETHERLANDS
关键词
MRP; planning; scheduling; capacity constraints; iterative simulation;
D O I
10.1080/095372897235307
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Traditional production control systems (based on the manufacturing resource planning concept) do not sufficiently support the planner in solving capacity problems, ignore capacity constraints and assume that lead times are fixed. This leads to problems on the shop floor, that cannot be resolved in the short term. This paper focuses on solving these capacity problems by improving capacity planning at the material requirements planning (MRP) level through integration of MRP and finite capacity planning. This results in a planning method for simultaneous capacity and material planning. The planning method is based on a new and more accurate primary process model, giving the planning algorithm more flexibility in solving capacity problems. The algorithm is based on advanced scheduling techniques and uses aggregated information, thus combining speed and accuracy. The algorithm is designed to use the available flexibility: alternative routeings, safety stock, and replanning of production orders and requirements. This paper also discusses such related issues as robustness, memory and the role of the human planner.
引用
收藏
页码:245 / 254
页数:10
相关论文
共 50 条
  • [1] Integrating MRP and finite capacity planning
    Taal, Martin
    Wortmann, Johan C.
    [J]. Production Planning and Control, 1997, 8 (03): : 245 - 254
  • [2] A new approach for finite capacity planning in MRP environment
    Na, Hong-bum
    Lee, Hyoung-Gon
    Park, Jinwoo
    [J]. LEAN BUSINESS SYSTEMS AND BEYOND, 2008, 257 : 21 - 27
  • [3] Improving production planning through finite-capacity MRP
    Rossi, Tommaso
    Pozzi, Rossella
    Pero, Margherita
    Cigolini, Roberto
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) : 377 - 391
  • [4] Integrating environmental issues into material planning: 'Green' MRP
    Melnyk, Steven A.
    Sroufe, Robert
    Montabon, Frank
    Calantone, Roger
    Tummala, R. Lal
    Hinds, Timothy J.
    [J]. Production and Inventory Management Journal, 40 (03): : 36 - 44
  • [5] CAPACITY PLANNING IN MRP, JIT AND OPT - A CRITIQUE
    GELDERS, LF
    VANWASSENHOVE, LN
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1985, 9 (1-3): : 201 - 209
  • [6] INTEGRATING CAPACITY PLANNING AND CAPACITY CONTROL.
    Belt, Bill
    [J]. Production and Inventory Management Journal, 1976, 17 (01): : 9 - 25
  • [7] A PRODUCT LOAD PROFILE APPROACH TO MRP CAPACITY PLANNING
    CHENG, TCE
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 18 (04) : 521 - 528
  • [8] Integrating capacity simulation into process planning
    Hetem, V
    [J]. WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2001, : 1470 - 1472
  • [9] A SIMULATION STUDY OF MRP CAPACITY PLANNING WITH UNCERTAIN OPERATION TIMES
    CHENG, TCE
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (02) : 245 - 257
  • [10] Finite capacity scheduling method for MRP with lot size restrictions
    Nagendra, PB
    Das, SK
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (08) : 1603 - 1623