Field load tests and numerical analysis of Qingzhou cable-stayed bridge

被引:36
|
作者
Ren, Wei-Xin [1 ]
Lin, You-Qin
Peng, Xue-Lin
机构
[1] Cent S Univ, Dept Civil Engn, Changsha 410075, Hunan Province, Peoples R China
[2] Fuzhou Univ, Dept Civil Engn, Fuzhou 350002, Fujian Province, Peoples R China
关键词
bridges; cable-stayed; load tests; bridge tests; finite element method; structural safety; China; monitoring;
D O I
10.1061/(ASCE)1084-0702(2007)12:2(261)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A field load test is an essential way to understand the behavior and fundamental characteristics of newly constructed bridges before they are allowed to go into service. The results of field static load tests and numerical analyses on the Qingzhou cable-stayed bridge (605 m central span length) over the Ming River, in Fuzhou, China are presented in the paper. The general test plan, tasks, and the responses measured are described. The level of test loading is about 80-95% of the code-specified serviceability load. The measured results include the deck profile, deck and tower displacements, and stresses of steel-concrete composite deck. A full three-dimensional finite-element model is developed and calibrated to match the measured elevations of the bridge deck. A good agreement is achieved between the experimental and analytical results. It is demonstrated that the initial equilibrium configuration of the bridge plays an important role in the finite-element calculations. Both experimental and analytical results have shown that the bridge is in the elastic state under the planned test loads, which indicates that the bridge has an adequate load-carrying capacity. The calibrated finite-element model that reflects the as-built conditions can be used as a baseline for health monitoring and future maintenance of the bridge.
引用
收藏
页码:261 / 270
页数:10
相关论文
共 50 条
  • [1] Dynamic field tests and modal analysis of a cable-stayed bridge
    Chen, C. H.
    Huang, M. C.
    Weng, C. Y.
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL SYMPOSIUM ON ENVIRONMENT VIBRATIONS: PREDICTION, MONITORING, MITIGATION AND EVALUATION, ISEV 2007, 2007, : 661 - 666
  • [2] Dead Load Analysis of Cable-Stayed Bridge
    Zhang, Tao
    Wu, ZhiMin
    [J]. COMPUTER COMMUNICATION AND MANAGEMENT, 2011, 5 : 270 - 274
  • [3] Static field tests of a large span cable-stayed bridge
    Ren, Wei-Xin
    [J]. 9th International Conference on Inspection Appraisal Repairs & Maintenance of Structures, 2005, : 107 - 118
  • [4] Numerical analysis of a cable-stayed bridge to blast loads
    Tang, Edmond Kai Cheong
    Hao, Hong
    [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON SHOCK & IMPACT LOADS ON STRUCTURES, 2007, : 557 - 564
  • [5] Study of Parameters Influencing Numerical Analysis of Load Tests for Cable-Stayed Bridge of a Semi-floating System
    Zhu, Li-Ming
    Chen, Yan-Ming
    Li, Jun-Tang
    [J]. Bridge Construction, 2020, 50 (04) : 72 - 76
  • [6] Dynamic tests of the Santarem cable-stayed bridge
    Rodrigues, J
    [J]. PROCEEDINGS OF IMAC-XIX: A CONFERENCE ON STRUCTURAL DYNAMICS, VOLS 1 AND 2, 2001, 4359 : 1146 - 1152
  • [7] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [8] Study on the Load Test of Xiangjiang Cable-stayed Bridge
    Sun, Yuelong
    Wang, Lei
    [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1438 - 1441
  • [9] Field Loading Test for Evaluation of Load Bearing Capacity of a Cable-Stayed Bridge
    Kim, Y. -M.
    Shin, S. -H.
    Lee, J.
    Jang, J. -H.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1132 - 1137
  • [10] Numerical Simulation of Buffeting Response of Cable-stayed Truss Bridge with Unconventional Load in Port
    Zhang, Xiantang
    Chen, Xiujin
    Wang, Qi
    Li, Peng
    Zhou, Hongmin
    [J]. JOURNAL OF COASTAL RESEARCH, 2019, : 275 - 279