Back analysis of settlement of Teven Road trial embankment using Bayesian updating

被引:18
|
作者
Huang, Jinsong [1 ]
Zeng, Cheng [1 ]
Kelly, Richard [2 ]
机构
[1] Univ Newcastle, Civil Surveying & Environm Engn, Callaghan, NSW, Australia
[2] SMEC, Australia & New Zealand Div, Brisbane, Qld, Australia
关键词
Settlement prediction; embankment; back analysis; Bayesian updating; SOIL;
D O I
10.1080/17499518.2019.1641609
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A trial embankment constructed on soft clay has been back analysed using Bayesian updating of parameters in a one-dimensional geotechnical model. The purpose of the back analysis was to demonstrate that Bayesian updating can be used to fit the data and to predict the final settlement. There was a limited amount of laboratory test data and site investigation data available, as is normal commercial practice. The initial material parameters were deemed to be biased due to sample disturbance and its effect on laboratory test data. The monitoring data comprised surface settlement measurements at the centreline of the embankment. The embankment was constructed in two stages over a period of 7 years. Bayesian updating of parameters using settlement was able to fit the entire time-settlement history.
引用
收藏
页码:320 / 325
页数:6
相关论文
共 50 条
  • [1] Efficient and flexible Bayesian updating of embankment settlement on soft soils based on different monitoring datasets
    Tian, Hua-Ming
    Cao, Zi-Jun
    Li, Dian-Qing
    Du, Wenqi
    Zhang, Fu-Ping
    [J]. ACTA GEOTECHNICA, 2022, 17 (04) : 1273 - 1294
  • [2] Auxiliary Bayesian updating of embankment settlement based on finite element model and response surface method
    Tian, Huaming
    Li, Dian-Qing
    Cao, Zi-Jun
    Du, Wenqi
    [J]. ENGINEERING GEOLOGY, 2023, 323
  • [3] Efficient and flexible Bayesian updating of embankment settlement on soft soils based on different monitoring datasets
    Hua-Ming Tian
    Zi-Jun Cao
    Dian-Qing Li
    Wenqi Du
    Fu-Ping Zhang
    [J]. Acta Geotechnica, 2022, 17 : 1273 - 1294
  • [4] Prediction of Settlement of Road Embankment Using Electrical Resistivity Tomography (ERT)
    Saha, A.
    Kundu, S.
    Dey, A. K.
    [J]. URBANIZATION CHALLENGES IN EMERGING ECONOMIES: ENERGY AND WATER INFRASTRUCTURE; TRANSPORTATION INFRASTRUCTURE; AND PLANNING AND FINANCING, 2018, : 639 - 648
  • [5] Embankment prediction using testing data and monitored behaviour: A Bayesian updating approach
    Zheng, Dong
    Huang, Jinsong
    Li, Dian-Qing
    Kelly, Richard
    Sloan, Scott William
    [J]. COMPUTERS AND GEOTECHNICS, 2018, 93 : 150 - 162
  • [6] Stochastic back analysis of material parameters of tailings dams using Bayesian updating approach
    Jiang, Shui-Hua
    Zhu, Ming-Ming
    Zeng, Shao-Hui
    Huang, Jin-Song
    Yang, Zhi-Gang
    Zhou, Chuang-Bing
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 : 77 - 82
  • [7] Correction of soil parameters in calculation of embankment settlement using a BP network back-analysis model
    Wang, Zhi-Liang
    Li, Yong-Chi
    Shen, R. F.
    [J]. ENGINEERING GEOLOGY, 2007, 91 (2-4) : 168 - 177
  • [8] Probabilistic back analysis of soil parameters and displacement prediction of unsaturated slopes using Bayesian updating
    Zhang Wen-gang
    Gu Xin
    Liu Han-long
    Zhang Qing
    Wang Lin
    Wang Lu-qi
    [J]. ROCK AND SOIL MECHANICS, 2022, 43 (04) : 1112 - 1122
  • [9] Probabilistic back analysis of slope parameters and reliability evaluation using improved Bayesian updating method
    Hu Hong-peng
    Jiang Shui-hua
    Chen Dong
    Huang Jin-song
    Zhou Chuang-bing
    [J]. ROCK AND SOIL MECHANICS, 2024, 45 (03) : 835 - 845
  • [10] Evaluating Settlement Risk due to Fill Placement: Updating Consolidation Settlement Parameters Using Bayesian Method
    Hoomaan, Ehssan
    Hudson, Martin B.
    Cuttell, Gregory D.
    [J]. GEO-CONGRESS 2024: GEOTECHNICS OF NATURAL HAZARDS, 2024, 349 : 721 - 730