OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS

被引:0
|
作者
Ozturk, Cemalettin [1 ]
Ornek, M. Arslan [2 ]
机构
[1] Natl Univ Ireland Univ Coll Cork, Insight Ctr Data Analyt, Cork, Ireland
[2] Izmir Univ Econ, Dept Ind Engn, Izmir, Turkey
基金
爱尔兰科学基金会;
关键词
constraint programming; advanced planning and scheduling; heuristics; INTEGER PROGRAMMING-MODEL; ALGORITHM; SELECTION;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manufacturing Resources Planning (MRPII) systems are unable to prevent capacity problems occurring on the shop floor because of the fixed lead time and backward scheduling logic. For this reason, a new breed of concepts called APS (Advanced Planning and Scheduling) systems emerged which include finite capacity planning at the shop floor level through constraint based planning. In this paper, we present a Constraint Programming (CP) model to show how optimization models could be used in this context. We also present a two phase heuristic to solve this complicated APS problem. While jobs are assigned to the best eligible machines to smooth the workload on the machines in the first phase, a constraint based scheduling heuristic schedules jobs once they are assigned to eligible machines in the second phase. We provide numerical tests and discuss the results for both the model and the heuristic. The concluding remarks and suggestions for future research are stated in the final section of the paper.
引用
收藏
页码:26 / 48
页数:23
相关论文
共 50 条
  • [1] Scheduling heuristic resourced-based on task time windows for APS (Advanced planning and scheduling) Systems
    Estombelo Montesco, Richard A.
    Pessoa, Marcosiris A. O.
    Blos, Mauricio F.
    [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 2273 - 2280
  • [2] Constraint Engine in Advanced Planning and Scheduling
    Ning, Weiwei
    Zhong, Huawei
    Lei, Yi
    An, Meng
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 935 - +
  • [3] Heuristic factory planning algorithm for advanced planning and scheduling
    Kung, Ling-Chieh
    Chern, Ching-Chin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2513 - 2530
  • [4] Advanced Planning & Scheduling Systems
    Thoney-Barletta, Kristin A.
    [J]. Textile World, 2024, 2024
  • [5] A heuristic optimisation approach for the scheduling of integrated manufacturing and distribution systems
    Ehm, Jens
    Freitag, Michael
    Frazzon, Enzo M.
    [J]. FACTORIES OF THE FUTURE IN THE DIGITAL ENVIRONMENT, 2016, 57 : 357 - 361
  • [6] A reappraisal on advanced planning and scheduling systems
    Lin, Chao-Hsien
    Hwang, Sheue-Ling
    Wang, Eric Min-Yang
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2007, 107 (08) : 1212 - 1226
  • [7] AN OVERVIEW OF THE ADVANCED PLANNING AND SCHEDULING SYSTEMS
    de Sousa, Thales Botelho
    Soares Camparotti, Carlos Eduardo
    Guerrini, Fabio Muller
    da Silva, Adauto Lucas
    Azzolini Junior, Walther
    [J]. INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2014, 5 (04): : 1032 - 1049
  • [8] Optimisation techniques for electrical power systems - Part 2 - Heuristic optimisation methods
    Song, YH
    Irving, MR
    [J]. POWER ENGINEERING JOURNAL, 2001, 15 (03): : 151 - 160
  • [9] OPTIMISATION OF DISTRICT HEATING SYSTEMS USING HEURISTIC METHODS: A REVIEW
    Sarbu, Ioan
    Mirza, Matei
    Crasmareanu, Emanuel
    [J]. PROCEEDINGS OF THE ROMANIAN ACADEMY SERIES A-MATHEMATICS PHYSICS TECHNICAL SCIENCES INFORMATION SCIENCE, 2020, 21 (04): : 319 - 328
  • [10] Evaluation of meta-heuristic approaches for scheduling optimisation of flexible manufacturing systems
    Saravanan, M.
    Haq, A. Noorul
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2011, 42 (2-3) : 150 - 158