Utilizing the BSC Method for IT Performance Evaluation of Construction Companies

被引:0
|
作者
Yan Xiaoli [1 ]
机构
[1] Shanghai Univ Engn Sci, Sch Management Studies, Shanghai 201620, Peoples R China
关键词
balanced scorecard (BSC); construction companies; IT performance evaluation; enterprise tier; project tier; MANAGEMENT;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This Paper applies the BSC method into measuring the IT performance of construction companies. First of all, Comparing BSC( balanced scorecard) method with other methods used before and demonstrating its feasibility in IT performance evaluation of construction companies. This method is a structured method which can evaluate the IT performance both from the enterprise and the project tier, changing the conditions that IT performance can only be evaluated from the enterprise or the project tier before. Secondly, the four perspectives of BSC are improved according to characteristics of construction companies. Thirdly, the idea of using the BSC-AHP-FCA method as a comprehensive method to fulfill the IT performance evaluation of construction companies is presented in this paper.
引用
收藏
页码:232 / 239
页数:8
相关论文
共 50 条
  • [1] Using the BSC-AHP-FCA Method to Evaluate IT Performance of Construction Companies
    Yan Xiaoli
    Wang Guangbin
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5151 - +
  • [2] A Study of Performance Evaluation Method for Construction Listed Companies Using DEA
    Zhang, Yuesong
    Xie, Yuning
    [J]. PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 557 - 560
  • [3] A Study on Performance Evaluation System for Chinese Private Companies Based on EVA and BSC
    Zhang, Hua
    Shen, Hui-hui
    Zhao, Yin-de
    Zhou, Yan
    [J]. 2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC), 2011, : 3021 - 3024
  • [4] Evaluation of performance of construction machinery listed companies
    Huang, Zhao-Ming
    Mi, Zhong-Chun
    [J]. PROCEEDINGS OF 2009 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE & SYSTEM DYNAMICS, VOL 3, 2009, : 37 - 43
  • [5] Study on Construction Project Performance Evaluation System Based on KPI and BSC
    Hu Biao
    Xiong Yinghan
    Tian Yun
    [J]. COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2010, : 206 - 210
  • [6] Study to the Performance Evaluation of Construction Enterprise Project Management based on the BSC
    Xu Bing
    Yu Hao
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 242 - 246
  • [7] A dynamic performance evaluation method based on SD-BSC
    滕春贤
    潘晓东
    胡宪武
    [J]. Journal of Harbin Institute of Technology(New series), 2007, (03) : 398 - 403
  • [8] Green Construction supply chain Performance Evaluation Based on BSC-SCOR
    Liu, Yi
    Xu, Jie
    Xu, Minghui
    [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [9] Neutrosophic management evaluation of insurance companies by a hybrid TODIM-BSC method: a case study in private insurance companies
    Zhang, Ke
    Xie, Yujuan
    Noorkhah, Seyed Ali
    Imeni, Mohsen
    Das, Sapan Kumar
    [J]. MANAGEMENT DECISION, 2023, 61 (02) : 363 - 381
  • [10] Development of financial performance evaluation framework for the Indian construction companies
    Vibhakar, Neelu Nandan
    Johari, Sparsh
    Tripathi, Kamalendra Kumar
    Jha, Kumar Neeraj
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1527 - 1539