Performance analysis of a grid-connected rooftop solar PV system in Kuala Terengganu, Malaysia

被引:37
|
作者
Anang, N. [1 ]
Azman, S. N. A. Syd Nur [1 ]
Muda, W. M. W. [1 ]
Dagang, A. N. [1 ]
Daud, Muhamad Zalani [1 ]
机构
[1] Univ Malaysia Terengganu, Renewable Energy & Power Res Interest Grp REPRIG, Eastern Corridor Renewable Energy SIG, Fac Ocean Engn Technol & Informat, Kuala Nerus 21030, Terengganu, Malaysia
关键词
Renewable energy; Solar photovoltaic; Emission; Energy analysis; Economic analysis; Terengganu Malaysia; PANELS; ANGLES; TILT;
D O I
10.1016/j.enbuild.2021.111182
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the real performance of a 7.8 kWp grid-connected rooftop photovoltaic (PV) system from a field monitoring at a residential house under the feed-in-tariff scheme. The performance parameters of PV system were assessed based on the two-year energy production in 2018-2019. PVsyst software was used to find the best orientation and tilt angle for the selected area to increase the system performance. Next, the PV derating factor was calculated from the two-day data collection. The derating factor was used in the simulation of the system using HOMER Pro, and the economic parameters for 21 years project lifetime were predicted. The results show that the performance of the installed system was better for 2019 compared to 2018 due to the higher solar irradiance in 2019 and the malfunction of inverter in July to August 2018. The best performance ratio obtained from the recorded data was 75.72% and the average loss was 1.68 kWh/kWp/day. The annual capacity factor and overall system efficiency were in the range of 13%-16% and 10%-12%, respectively. The best tilt angle and orientation was 5 degrees with the increment of annual energy production up to 4.8%. From the simulation, the error between the simulation and measurement results was high when the derating factor was assumed to be 100%. When the value used was based on the calculation obtained from data collection, the annual error was 1.7%, which is acceptable. Thus, the software is considered reliable assuming no component failure in the PV system. From the economic analysis, the annual net profit can be obtained was almost RM 3,000, and the payback period was in the range of 5-7 years. In addition, the installed PV system on the single house has the potential to reduce the CO2 emission of approximately 7.45 tons/year. (C) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Feasibility study and Performance evaluation of a grid-connected Rooftop Solar PV system
    Vasita, Jaya
    Shakhiya, Querie
    Modi, Jvalant
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INFORMATION, COMMUNICATION, INSTRUMENTATION AND CONTROL (ICICIC), 2017,
  • [2] Performance Analysis of a Grid-Connected Rooftop Solar Photovoltaic System
    Akpolat, Alper Nabi
    Dursun, Erkan
    Kuzucuoglu, Ahmet Emin
    Yang, Yongheng
    Blaabjerg, Frede
    Baba, Ahmet Fevzi
    [J]. ELECTRONICS, 2019, 8 (08)
  • [3] Performance Analysis of Grid-Connected PV System
    Elbaset, Adel A.
    Hassan, M. S.
    Ali, Hamdi
    [J]. PROCEEDINGS OF 2016 EIGHTEENTH INTERNATIONAL MIDDLE EAST POWER SYSTEMS CONFERENCE (MEPCON), 2016, : 675 - 682
  • [4] Energy Storage Sizing for Rooftop Grid-Connected PV System
    Abul'Wafa, Ahmed R.
    [J]. ELECTRIC POWER COMPONENTS AND SYSTEMS, 2017, 45 (03) : 331 - 343
  • [5] Solar PV system performance in a combined hybrid grid-connected system
    Alharthi, Yahya Z.
    [J]. 2021 IEEE 48TH PHOTOVOLTAIC SPECIALISTS CONFERENCE (PVSC), 2021, : 195 - 198
  • [6] Performance simulation of grid-connected rooftop solar PV system for small households: A case study of Ujjain, India
    Dondariya, Chandrakant
    Porwal, Deepak
    Awasthi, Anshul
    Shukla, Akash Kumar
    Sudhakar, K.
    Manohar, Murali S. R.
    Bhimte, Amit
    [J]. ENERGY REPORTS, 2018, 4 : 546 - 553
  • [7] Energy performance and loss analysis of 100 kWp grid-connected rooftop solar photovoltaic system
    KhareSaxena, Anupama
    Saxena, Seema
    Sudhakar, K.
    [J]. BUILDING SERVICES ENGINEERING RESEARCH & TECHNOLOGY, 2021, 42 (04): : 485 - 500
  • [8] Life-cycle ecological footprint assessment of grid-connected rooftop solar PV system
    Biswas, Ajay
    Husain, Dilawar
    Prakash, Ravi
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE ENGINEERING, 2021, 14 (03) : 529 - 538
  • [9] Investigating energy policies to boost grid-connected rooftop solar PV in Sudan
    Ahmed, Tarig Z.
    Mohamed, Ayah
    Ahmed, Mawahib Eltayeb
    Abdalgader, Ahmed Osman Elamin
    Hassan-Sayed, Mohamed G.
    [J]. CLEAN ENERGY, 2023, 7 (05): : 994 - 1005
  • [10] Highly efficient flyback microinverter for grid-connected rooftop PV system
    Hasan, Rasedul
    Mekhilef, Saad
    [J]. SOLAR ENERGY, 2017, 146 : 511 - 522