A note on an EOQ model for deteriorating items under supplier credit linked to ordering quantity

被引:27
|
作者
Liao, Jui-Jung [1 ]
机构
[1] Lunghwa Univ Sci & Technol, Grad Sch Business & Management, Tao Yuan, Taiwan
关键词
inventory; lot-size; delay payment; deteriorating items;
D O I
10.1016/j.apm.2006.05.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper explores the inventory replenishment policy for deteriorating items in which the supplier provides a permissible delay to the purchaser if the order quantity is greater than or equal to a predetermined quantity. As a matter of fact, the inventory system discussed by this paper is the same as that of Chang et al. [C.T. Chang, L.Y. Ouyang, J.T. Teng, An EOQ model for deteriorating items under supplier credit credits linked to ordering quantity, Appl. Math. Model. 27 (2003) 983-996]. However, their approach in solving the problems needs further analysis. This article deals with an alternative approach to present a simple procedure in order to determine the optimal ordering policy when the supplier provides a permissible delay in payments linked to order quantity. Numerical examples reveal that the solution algorithm described in this paper is accurate and rapid. (c) 2006 Elsevier Inc. All rights reserved.
引用
收藏
页码:1690 / 1699
页数:10
相关论文
共 50 条