Bid Evaluation Research of Construction Project Based on Two-stage Entropy Weight

被引:1
|
作者
Zhang Yi [1 ]
Wang Zhuo-fu [1 ]
机构
[1] Hohai Univ, Inst Constrct Project Management, Nanjing 210098, Peoples R China
关键词
Entropy Weight; Two-stage Entropy Weight; Bid Evaluation of Construction Project;
D O I
10.1109/ICIII.2009.191
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper defines the evaluation index system of construction project first, on this basis, uses the Two-stage Entropy Weight method to determine the weight, thus avoids the faults of expert grading with a subjective attitude, at the same time, it's a more objective method than one-level entropy weight, then, the article uses an empirical analysis describe the application of two-stage entropy weight method,finally, the article gives several suggestions.
引用
收藏
页码:133 / 135
页数:3
相关论文
共 50 条
  • [1] Risk Sharing Research of Construction Project Based on Entropy Weight
    Zhang Yi
    Wang Zhuo-fu
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 689 - 691
  • [2] Research on the Post Evaluation for Thermal Power Construction Project Based on Entropy Weight Fuzzy Comprehensive Evaluation
    Zhao, Jianna
    Zhao, Yuanyuan
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INTELLIGENT COMMUNICATION, 2015, 16 : 252 - 255
  • [3] Research on Comprehensive Bid Evaluation of Construction Project Based on the Principal Component Analysis
    Pang, Nansheng
    Shi, Yingling
    Ji, Changming
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5412 - 5416
  • [4] Bid evaluation in civil construction under uncertainty: A two-stage LSP-ELECTRE III-based approach
    Chen, Zhen-Song
    Zhang, Xuan
    Pedrycz, Witold
    Wang, Xian-Jia
    Skibniewski, Miroslaw J.
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2020, 94
  • [5] Research on the evaluation methods of bid of construction project based on improved BP neural network
    Yang, Jie
    Qu, Hongjian
    Zhou, Liang
    [J]. WSEAS Transactions on Computers, 2010, 9 (01): : 93 - 102
  • [6] Study of The Construction Plan Bid Assessment Method of The Coal Mine Project Based on Entropy-weight Method
    Wang, Yang
    Zhang, Chuanming
    Wang, Zuhe
    [J]. APPLIED MECHANICS AND MATERIALS I, PTS 1-3, 2013, 275-277 : 2748 - +
  • [7] RESEARCH ON THE CONSTRUCTION OF ECOLOGICAL CIVILIZATION BASED ON HECKMAN TWO-STAGE MODEL
    Chi, Haitao
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (02): : 1706 - 1711
  • [8] The Construction Project Bid Evaluation Based on Gray Relational Model
    Yan Hong-yan
    [J]. CEIS 2011, 2011, 15
  • [9] Research on Two-Stage Model of Project Risk Assessment Based on Knowledge Discovery
    Zhang, Liwei
    Zhao, Dandan
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON COMPUTERS & INFORMATICS, 2015, 13 : 1398 - 1404
  • [10] A two-stage discretization algorithm based on information entropy
    Wen, Liu-Ying
    Min, Fan
    Wang, Shi-Yuan
    [J]. APPLIED INTELLIGENCE, 2017, 47 (04) : 1169 - 1185