Verification of the technical feasibility of composting: case study

被引:2
|
作者
Edderkaoui, Raounak [1 ]
Khomsi, Driss [1 ]
Hamidi, Ahmed [2 ]
Baiti, Hicham Bennani [2 ]
Souidi, Hanane [3 ]
Aqil, Mohammed [3 ]
机构
[1] Univ Mohammed V Rabat, Mohammadia Sch Engineers, Civil Engn Dept, Hydraul Syst Anal Team EASH, BP 765, Rabat, Morocco
[2] EcoMed Grp, Rabat, Morocco
[3] Mohammed V Univ Rabat, Mohammadia Sch Engn, Mineral Engn Dept, GIE Lab, BP 765, Rabat, Morocco
关键词
D O I
10.1051/e3sconf/202015002018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The aim of this work is to verify the technical feasibility of composting in the case of Marrakech prefecture. On the basis of waste composition and in accordance with the choice of the installation of Marrakech controlled landfill, composting has been considered as the most suitable waste treatment. To ensure the feasibility of composting, physicochemical analyses have been carried out on the fermentable part of waste; analyses on the content of metal elements have also been performed on the fine fraction, since the most important part is located in the same fraction. All parameters determined in the laboratory, have shown that optimal conditions to have good quality compost have been respected. The only restriction identified is the copper content, which should be less than 20 ppm. Generally the low levels of metal element content indicate that the storage and collection conditions of waste have not influenced their quality. On the other hand, the process must be properly controlled and managed, to produce high-quality compost.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] TECHNICAL AND ECONOMIC FEASIBILITY OF SUPERCONDUCTING POWER TRANSMISSION - CASE STUDY
    FORSYTH, EB
    MULLIGAN, GA
    BECK, JW
    WILLIAMS, JA
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, PA94 (01): : 161 - 169
  • [2] TECHNICAL FEASIBILITY OF THE ACCLIMATIZATION SYSTEM IN AVIARY OF POSTURE: A CASE STUDY
    Pereira, Danilo F.
    Kodaira, Vanessa
    Bueno, Leda G. de F.
    Soares, Nilce M.
    Salgado, Douglas D'alessandro
    ENGENHARIA AGRICOLA, 2017, 37 (05): : 855 - 866
  • [3] Primary and secondary sludge composting:: a feasibility study
    Arrougé, T
    Moresoli, C
    Soucy, G
    PULP & PAPER-CANADA, 1999, 100 (04) : 33 - 36
  • [4] Decentralized community composting feasibility analysis for residential food waste: A Chicago case study
    Pai, Shantanu
    Ai, Ning
    Zheng, Junjun
    SUSTAINABLE CITIES AND SOCIETY, 2019, 50
  • [5] Technical feasibility of a photovoltaic power plant on landfills. A case study
    Sangiorgio, Silvia
    Falconi, Marco
    70TH CONFERENCE OF THE ITALIAN THERMAL MACHINES ENGINEERING ASSOCIATION, ATI2015, 2015, 82 : 759 - 765
  • [6] Technical Feasibility in Reaching Renewable Energy Targets; Case Study on Australia
    Jacob, Reenu Tresa
    Liyanapathirana, Ranjith
    2018 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENERGY SYSTEMS (ICEES), 2018, : 630 - 634
  • [7] Virtual Power Plant for a Smart Grid: A Technical Feasibility Case Study
    Giron, Carlos
    Omran, Shaimaa
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2018, 8 (02): : 830 - 837
  • [8] Evaluation of the technical feasibility aspects of the fishing structures: a case study of Izmir coast
    Dagli, Begum Yurdanur
    Uncu, Dilay Yildirim
    Gokkus, Umit
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2023, 41 (01): : 93 - 105
  • [9] Technical feasibility analysis of an underground HVDC line. A case study in Ecuador
    Jacho, Andres
    Barrera, Hugo
    Plazarte, Juan
    Urquizo, Javier
    PROCEEDINGS OF 2021 IEEE 30TH INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE), 2021,
  • [10] MONTICELLO STUDY POINTS TO TECHNICAL FEASIBILITY
    MUSOLF, DM
    CAREY, JJ
    NUCLEAR ENGINEERING INTERNATIONAL, 1986, 31 (388): : 44 - 45