共 50 条
- [2] Key Risk Factors Identification for PPP Waste-to-Energy Incineration Projects [J]. ICCREM 2021: CHALLENGES OF THE CONSTRUCTION INDUSTRY UNDER THE PANDEMIC, 2021, : 163 - 170
- [4] Critical Risk Identification for PPP Waste-to-Energy Incineration Projects in China: A Multiple Case Study [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 328 - 336
- [7] INSIGHTS IN THE DEVELOPMENT OF WASTE-TO-ENERGY PROJECTS [J]. PUBLIC WORKS, 1985, 116 (05): : 78 - 80